EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 1, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Lubbock, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Lubbock, TX, is seeking competitive, sealed, proposals for Unpaved Roads Improvements C.O. Phase 4. Questions Due Date: Jun 14th 2024, 4:00 PM CDT One tap mobile +13462487799,,9759171012# US (Houston) +16699009128,,9759171012# US (San Jose) --- Dial by your location o +1 346 248 7799 US (Houston) o +1 669 900 9128 US (San Jose) o +1 719 359 4580 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 669 444 9171 US o +1 312 626 6799 US (Chicago) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 646 558 8656 US (New York) o +1 646 931 3860 US o +1 689 278 1000 US o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 309 205 3325 US o 833 548 0276 US Toll-free o 833 548 0282 US Toll-free o 877 853 5257 US Toll-free o 888 475 4499 US Toll-free Meeting ID: 975 917 1012 Find your local number: https://zoom.us/u/adIdcAdlNl The purpose of this project is to improve existing unpaved roads with asphalt pavement, curb and gutter throughout various locations around The City. roads to be paved are certain segments of N. Mulberry Ave from Idalou Road to E. Erskine St., N. Mulberry Ave from E. 1 st St. to E. Baylor St., and E. Erskine from Idalou Hwy. to N. Mulberry Ave in Lubbock, TX. B. Major work items are: 1) Installation of approximately 13,500 square yards of asphalt pavement, 2) approximately 6,700 linear feet of curb and gutter, 3) approximately 1,650 square yards of concrete valley gutters, fillets, and driveways. C. The Contractor shall furnish all labor, equipment, and materials required for the complete construction of the work as shown on the drawings and specified herein. D. All work shall be performed in accordance with the most recent City of Lubbock Design Standards for Water and Sanitary Sewer construction. E. A maximum of 500 feet of trench open at a time. 1.4. Work shall also include restoration or replacement of all removed or damaged pavement, curb, sidewalk, gutter, shrubbery, fence, sod or other disturbed surfaces or structures in a condition equal to that before the work began to the satisfaction of the Engineer. ALL REQUESTS FOR ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS REQUEST FOR PROPOSALS (RFP) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR DAYS PRIOR TO THE PROPOSAL CLOSING DATE AND ADDRESSED TO: Teofilo Flores, Asst. Director City of Lubbock Purchasing and Contract Management Office 1314 Avenue K, Floor 9, Lubbock, Texas, 79401 Fax: 806-775-2164 Email: TKFlores@mylubbock.us The notice to proceed will be mid to late august and have recommended 5 months for substantial and 6 months for final completion

Award

Roads / Highways

$1,394,844.00

Public - City

Paving, Site Work

17

17

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
8
Bidding Soon
138
All Active Projects
51
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

August 15, 2024

img_map_placeholder

Multiple Locations, Lubbock, TX

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Unpaved Roads Improvements C.O. Phase 4

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.