Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 23, 2026 at 8:00 PM
Updated August 29, 2026
Site work, paving, outdoor lighting and new construction of a mixed-use development in Rudy, Arkansas. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Purpose of This Project is to Construct Grading and Structures of a Four - Lane Interstate Facility, Including Improvements to the Interstate 40 and 49 Interchange in Crawford County. This Project Consists of Clearing and Grubbing, Removal and Disposal Items, Stone Backfill, Earthwork, Select Granular Backfill, Rock Fill, Trenching and Shoulder Preparation, Aggregate BASE Course, Cement in Cement Stabilized Crushed Stone BASE Course, Processing Cement Stabilized Crushed Stone BASE Course, Achm BASE, Binder, and Surface Courses, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Approach Slabs and Gutters, Maintenance of Traffic, Concrete Ditch Paving, Minor Drainage, Erosion Control, Pavement Marking, Its Items, Illumination Items, Sign Items, Construct Two Continuous Plate Girder Bridges (Total Length 1031.95'), Construct Five Rc Box Culverts (Total Length Length: 5.028 Miles in Length. Question Deadline 10/28/2026 - Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. These contracts are subject to normal prequalification, licensing and bonding requirements, applicable labor laws, non-discrimination provisions, wage rate laws and other Federal laws including the Fair Labor Standards Acts of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply. The Arkansas Department of Transportation (ARDOT) complies with all civil rights provisions of federal statutes and related authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Therefore, ARDOT does not discriminate on the basis of race, sex, color, age, national origin, religion (not applicable as a protected group under the FMCSA Title VI Program), or disability in the admission, access to and treatment in ARDOT's programs and activities, as well as ARDOT's hiring or employment practices. Complaints of alleged discrimination and inquiries regarding ARDOT's nondiscrimination policies may be directed to the Civil Rights Division, P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: Civil.Rights@ardot.gov The Department reserves the right to reject any or all bids and to waive any formalities. AR DOT - Clear Creek Rd. - I-40 (Phase 1) (F) MBE (5.6%), WBE (6.9%)
GC Bidding
Roads / Highways
$141,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2026
January 4, 2027
Multiple Locations, Rudy, AR
Related To This Project
Rudy, AR
Bid Date: Jan 15 2025
Rudy, AR
Bid Date: Feb 26 2025
Rudy, AR
Bid Date: Feb 27 2025
Rudy, AR
Bid Date: Feb 27 2025
Rudy, AR
Bid Date: May 21 2025
Rudy, AR
Bid Date: Aug 12 2025
Rudy, AR
Bid Date: Jan 12 2022
Rudy, AR
Bid Date: Jun 28 2023
Rudy, AR
Bid Date: Mar 21 2023
Rudy, AR
Bid Date: Feb 23 2023
Rudy, AR
Bid Date: Jan 11 2023
Rudy, AR
Bid Date: Jan 11 2023
Waldo, AR
--
Lockesburg, AR
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
