BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Las Vegas, Nevada. Completed plans call for site work for a municipal facility.

Lead Reclamation Project at Clark County Shooting Complex Questions Due Date: Jun 19th 2024, 10:00 AM PDT Questions regarding this RFP must be directed to the contact listed in the RFP document. Should you have any questions, please contact me at Jeana.Tarango@ClarkCountyNV.gov. INTENT COUNTY is soliciting proposals for Lead Reclamation Project at the Clark County Shooting Complex. The intent of this formal Request for Proposal is to receive responses from qualified respondents for awards exempt from competitive solicitation under Nevada Revised Statutes (NRS) 332.115, Revised 2019. 3. SCOPE OF PROJECT A. Remove lead from earthen backstops for a minimum depth of six (6) inches for the entire face of the berm. B. Remove lead from the main bullet impact zone to a minimum depth of twenty-four (24) inches. The main impact zone location is determined by the location of each shooting position or station at the firing line. The main impact zone for each range is describes as follows: o Shooters Public Range 50 yd.: should be right at the toe of the berm and up one-hundred eighty (180) inches, full length of the berm. o Shooters Public Range 100 yd.: should be right at the toe of the berm and up to one-hundred twenty (120) inches, full length of the berm. o Shooters Public Range 200 yd.: should be right at the toe of the berm and up to seventy-two (72) inches from the top, full length of the berm. o Shooters Education Center 50 yd.: should be right at the toe of the berm and up to one-hundred twenty (120) inches, full length of the berm. o Shooters Educations Center 100 yd.: should be right at the toe of the berm and up to one-hundred twenty (120) inches, full length of the berm. C. Any clean soil that results from the lead screening process will be reinstalled on the berm. D. Re-establish any berms or grades where berms will have a face slope of 1:1 and a minimum height of twenty (20) feet for all berms. E. All reclaimed areas shall be returned back to original grade, free of rock and material piles. F. Deliver all reclaimed lead to a COUNTY approved recycling facility. Rifle Shooting Range Berm Reconstruction Existing soil-cement material should be thoroughly mixed with 5% Portland cement and used to reconstruct the berm at the rifle shooting range. The mixture should be pulverized so that the soil-cement mixture does not contain material larger than 1 inch in size at the time of compaction. Water should be added to bring the soil-cement mixture to within +- 2% of the optimum moisture content (8.5%). Water should not be added until soil-cement mixture is thoroughly mixed. Soil-cement mixtures should be placed and compacted in layers not exceeding 8 inches in thickness. For effective bonding of successive layers, the time between placements of successive layers should be minimized, and dry cement should be applied at a rate of 1 lb. /yd2 to a moistened surface prior to placement of subsequent layers. Compaction should be completed not more than four hours after water was introduced in to the mixture. The soils cement should be compacted to a minimum of 96% of the maximum density determined in accordance with ASTM D558. Curing should be provided to help the soil-cement mixture retain moisture and hydrate. A moisture retaining cover, such as bituminous material, plastic sheets, wet sand, fog type water spray, and wet burlap could be used for curing. When bullets or shot are reclaimed from a range, coordinate application of a soil stabilization agent to the backstop and range floor, or shotfall zone, as part of preparing the range to resume shooting in coordination with Clark County Department of Air Quality

Award

Municipal

$250,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
45
Bidding Soon
594
All Active Projects
282
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 11, 2024

August 12, 2024

img_map_placeholder

11357 N Decatur Blvd, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.