BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Antonio, Texas. Conceptual plans call for site work for a water / sewer project.

Estimated Budget: $7,000,000.00. Est. Construction Cost $59,437,000.00 Question Deadline 06/14/2024 at 2:00 PM CT. Respondents may submit technical questions concerning the services in this RFQ in writing. Electronic inquiries by e-mail will be accepted. The contact person for this solicitation is: Roxanne Lockhart Contract Administration Department San Antonio Water System Customer Center Building 2800 U.S. Hwy 281 North, Counter Services San Antonio, TX 78212 Email: roxanne.lockhart@saws.org This project will rehabilitate approximately 3,225.9 LF of 48-inch pipe, 5,306.7 LF of 60-inch pipe, 8,596.7 LF of 66-inch pipe, and 2,364 LF of 72-inch pipe via CIPP. This project will replace approximately 971 LF of 48-inch pipe and 882.7 LF of 60-inch pipe via Open Cut. 29 pipe segments have been identified in this package and are located in close proximity to Salado Creek from Pecan Grove to the Arboretum San Antonio. CIPP and Open Cut are the suggested remedial methods due to pipe condition, location, and size. The San Antonio Water System (SAWS) is accepting Statements of Qualifications (SOQ) from firms to provide professional engineering design services, as well as all associated engineering services, necessary to advance the sanitary sewer overflow and reduction program (SSORP) projects identified within this RFQ to the final design phase, which includes both bid and construction phase services. SAWS will provide Respondents with design deliverables as part of this RFQ. Background In June 2013, SAWS entered into a Consent Decree (CD) with the United States Environmental Protection Agency (EPA), which requires certain actions by SAWS to rehabilitate the wastewater collection system and reduce sanitary sewer overflows (SSOs). The CD includes requirements for the Capacity, Management, Operations, and Maintenance (CMOM) Program. As part of the ongoing CMOM component of the CD, SAWS is required to perform alternative analysis on targeted and urgent mains identified as high risk. The results of the CMOM alternative analysis are provided in the Project Scoping Report.

Conceptual

Water / Sewer

$59,437,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.