Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 17, 2024 at 8:00 PM
Updated June 18, 2024
Site work for a water / sewer project in San Antonio, Texas. Conceptual plans call for site work for a water / sewer project.
Estimated Budget: $7,000,000.00. Est. Construction Cost $59,437,000.00 Question Deadline 06/14/2024 at 2:00 PM CT. Respondents may submit technical questions concerning the services in this RFQ in writing. Electronic inquiries by e-mail will be accepted. The contact person for this solicitation is: Roxanne Lockhart Contract Administration Department San Antonio Water System Customer Center Building 2800 U.S. Hwy 281 North, Counter Services San Antonio, TX 78212 Email: roxanne.lockhart@saws.org This project will rehabilitate approximately 3,225.9 LF of 48-inch pipe, 5,306.7 LF of 60-inch pipe, 8,596.7 LF of 66-inch pipe, and 2,364 LF of 72-inch pipe via CIPP. This project will replace approximately 971 LF of 48-inch pipe and 882.7 LF of 60-inch pipe via Open Cut. 29 pipe segments have been identified in this package and are located in close proximity to Salado Creek from Pecan Grove to the Arboretum San Antonio. CIPP and Open Cut are the suggested remedial methods due to pipe condition, location, and size. The San Antonio Water System (SAWS) is accepting Statements of Qualifications (SOQ) from firms to provide professional engineering design services, as well as all associated engineering services, necessary to advance the sanitary sewer overflow and reduction program (SSORP) projects identified within this RFQ to the final design phase, which includes both bid and construction phase services. SAWS will provide Respondents with design deliverables as part of this RFQ. Background In June 2013, SAWS entered into a Consent Decree (CD) with the United States Environmental Protection Agency (EPA), which requires certain actions by SAWS to rehabilitate the wastewater collection system and reduce sanitary sewer overflows (SSOs). The CD includes requirements for the Capacity, Management, Operations, and Maintenance (CMOM) Program. As part of the ongoing CMOM component of the CD, SAWS is required to perform alternative analysis on targeted and urgent mains identified as high risk. The results of the CMOM alternative analysis are provided in the Project Scoping Report.
Conceptual
Water / Sewer
$59,437,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2024
Multiple Locations, San Antonio, TX
Related To This Project
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Jul 02 2024
San Antonio, TX
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed