BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a residential development in Bluffton, South Carolina. Completed plans call for the renovation of a residential development; and for site work for a residential development.

As of July 30,2024, project was awarded to Hilton Head Landscapes, awarded amount is $94,737.93. https://www.blufftontoday.com/story/opinion/columns/2024/07/05/bluffton-mayor-larry-toomer-discusses-the-town-budget/74044861007/ Town leaders know that many residents’ eyes glaze over when we speak of the three main ingredients to the Town’s annual workplan. It may sound like “government speak” when budgets, strategic plans and action items are mentioned. While the terms may seem boring, the projects which the Town’s workplan produces may excite you. Let me break down the new fiscal budget, which began July 1, and how it may relate to you. The new approximate $90.6 million dollars budget aims to enhance various public services and infrastructure projects, reflecting the town's commitment to maintaining its charm and improving the quality of life for its residents. One of the most notable aspects of the new budget is the stability in property taxes. Since 2014, Bluffton has managed to keep property taxes steady, even reducing the millage rate in 2019 and 2023. For a typical house appraised at around $390,500, the town portion of the tax bill will remain approximately $677.32. This consistency provides financial predictability for homeowners, ensuring that the costs associated with property taxes do not increase unexpectedly. The budget supports new projects such as the Town’s new Welcome Center, which will be located at the Squire Pope Carriage House in Wright Family Park. The new Welcome Center is expected to open in early 2025. The Center will give residents and visitors an overview of Bluffton’s history, culture, spirit, natural resources and attractions. The Squire Pope Carriage House is among Bluffton’s “contributing resources” with its historic significance of being one of the few structures which survived the 1863 “Burning of Bluffton.” Thanks to a $1.35 million-dollar federal grant and town funds, the Bluffton Police Department will replace its aging equipment, which will further equip the police department to provide safety, security, and more partnerships/events with the community. Residents will also see significant investments in public infrastructure. The Capital Improvements Program (CIP) Fund, totaling $32.3 million, prioritizes parks, stormwater, and sewer projects. This includes the Historic District sewer projects, Pritchard Street Drainage and Bridge Street Streetscape Improvement projects. Stormwater and sewer infrastructure projects, especially for the few Town neighborhoods which weren’t pre-planned communities, protect the town’s and region’s natural resources. The Riverside Barn Park, the town’s largest park with more than 37 acres, is expected to open in late 2024, with the barn opening for events the following year. A much-anticipated splash pad will be installed at Oscar Frazier Park this summer. The New River Linear Trail will also receive a multi-million-dollar upgrade to pave half the width of the trail, making it more accessible to walkers, bikers, and those with mobility issues. The new budget also underscores Bluffton’s dedication to affordable housing. Projects like the Housing Assistance Program will continue to receive support, assisting income-qualified residents with necessary “safe and dry” home repairs. This program combats the compounding housing crisis, prevents blight and keeps residents in safe homes. Economic development is another key focus, with incentives available for businesses to locate in the fastest growing areas of Bluffton and the ongoing support for the Don Ryan Center for Innovation, the town’s economic development department and business incubator. The Town’s Economic Development Incentive Program (EDIP) provides a reduction in fees and utility costs for businesses which are relocating or locating west of Buckwalter Parkway, in an effort to bring more services to Bluffton’s fastest growing areas. As a reminder, the Town is among five municipalities in the state with the highest bond rating for a town or city. This means the Town can borrow money, if needed, at lower rates and this status gives credence to the Town’s healthy financial status. The Town thanks each resident it serves as the town strives to always increase its high quality of life, we all enjoy projects that protect our natural resources, create parks and open spaces for neighbors to gather, and help each other when needed. ----------------------------------------------------------- A. The Work of Project is defined by the Contract Documents and consists of the following 1. Squire Pope Carriage House, located within the Wright Family Park is under construction. This scope of this contract includes site landscape improvements such as walks, parking improvements, signage, site furnishings, planting. and other Work indicated in the Contract Documents. B. Type of Contract: 1. Project will be constructed under a single prime contract. The general scope of services includes the following 1. Tree removal, shrub transplant, tree protection fencing; 2. Fine grading; 3. Vehicular and pedestrian paving; 4. Pavement markings and curb stop installation; 5. Site furnishing procurement and installation; 6. Procurement and installation of trees, shrubs, groundcovers, mulch and annual plantings; 7. Irrigation upfit and installation. Question Deadline 06/13/2024 at 2:00 PM ET Questions must be submitted online via. The Town of Bluffton is soliciting competitive sealed bids from experienced and qualified landscape contractors ("Offerors") to provide landscape and hardscape improvements at the Squire Pope Carriage House located at 111 Calhoun Street, Bluffton, SC 29910. Work is expected to be performed beginning in July and completed by September 2024.

Award

Residential Subdivision

$94,738.00

Public - City

Renovation, Site Work

13

9

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
42
Bidding Soon
528
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 1, 2024

img_map_placeholder

111 Calhoun St, Bluffton, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.