BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a swimming pool.

As of August 21, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Contract No. 24-PK4 (Re-Bid) - Mechanical: The scope of work generally removal of existing pool heater and flue; installation of new pool heater (supplied by others) and flue including roof penetration; and all necessary appurtenances. Any technical questions regarding the bid documents are to be directed to LSSE. The project is being financed, in part, by the RAAC via a GEDTF Grant, and by CFA via a GTRP Grant. Bidder must agree to comply with all requirements associated with the grants. Compliance is required with the Pennsylvania Prevailing Wage Act of 1961, P.L. 987, No. 442; Title VI and other applicable provisions of the Civil Rights Act of 1964; the Department of Labor Equal Opportunity Clause (41 CFR 60 -1.4); Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with Section 504 of Rehabilitation Act of 1973 and Americans with Disabilities Act of 1990; the Allegheny County MBE/WBE Program enacted July 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance #6867-12, setting forth goals of 5 percent Veteran Owned Small Businesses. The bid must be accompanied by a bid bond in the amount of ten percent (10%) of the bid, made payable to the Borough of Baldwin. The Borough reserves the right to reject any or all proposals and to waive any informalities in the bidding. No bid may be withdrawn for ninety (90) calendar days after the scheduled time for receipt of bids. Contract No. 24-PK4 (Re-Bid) - Mechanical Construction: The Mechanical Contractor's limits of work generally include installing all HVAC related equipment/items in the Pool Equipment Building including replacement boiler and Court Storage Room/Chemical Feed Room exhaust fan. Scope of work generally includes, but not limited to the following: a. Attend pre-construction meeting with General, Electrical and Plumbing Contractors. General Contractor will present project schedule and coordination plans; all contractors shall review and General Contractor shall obtain signoffs from all Contractors. General Contractor shall act as prime contractor and run all coordination meetings throughout construction. b. Select Demolition of existing boiler, flue piping, gas, piping, etc. Select demolition of existing exhaust fan. c. Install replacement exhaust fan within existing "Court Storage Room/Chemical Feed Room" containing chlorinator d. Install pool heater (provided by Owner). Furnish proposed louvers/dampers as shown on Contract Documents. Coordinate installation of same with General Contractor. Incidental with heater installation, complete all modifications or repairs to the existing roofing system either incidental to removal of existing Pool Heater Flue or resulting from new Pool Heater Flue installation. Contractor to complete repairs of Firestone Membrane Roofing utilizing a licensed Firestone Licensed Applicator and reported to Firestone in accordance with the Owner's existing roof warranty. 5. Provide, install, wire, test and place in operation all major equipment and all appurtenances as specified and/or indicated on the Contract Drawings or as required for complete operable system in general accordance with the following

Bid Results

Swimming Pools

$182,899.00

Public - City

Renovation

45

18

2

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
43
Bidding Soon
831
All Active Projects
325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2024

August 20, 2024

img_map_placeholder

742 Lechner Ln, Pittsburgh, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.