BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Prince Edward, Ontario. Contact the soliciting agency for additional information.

Reference Number 0000271456 Question Acceptance Deadline 2024/06/13 10:00:00 AM EDT Pricing Lump sum Quinte Conservation is requesting a dam safety review be completed for the Macaulay Dam. The review will be completed in accordance with the Dam Safety Reviews Best Management Practices (OMNR, 2011). It is anticipated that the work will include all the components of a dam safety review. Regional frequency analysis, hydrologic modelling, flood routing and hydraulic analyses shall be in accordance with the Technical Guide - River and Stream Systems: Flooding Hazard Limits, (OMNR, 2002). A dam break analysis is to be completed as part of this study. Undertake an evidence based or conservative stability analysis of the structure to determine if dam safety criteria are satisfied. A seismicity assessment should also be included. If the structure does not meet stability requirements using conservative assumptions, concrete and geotechnical testing should be completed to confirm condition and material properties. A $15,000 cash allowance for this item is to be included for destructive and non-destructive testing. Create AutoCAD drawings complete with any revised elevations (obtained by surveying the structure), corroded metal, and all other applicable inspections notes. A Public Safety Assessment (PSA) is to be completed to identify potential public safety hazards. The PSA is to be completed in accordance with the Public Safety Around Dams Best Management Practices (OMNR, 2011). A recommendation should be made as to whether a Public Safety Plan should be completed. Provide a provisional price to complete a Public Safety Plan. Recommend actions, surveillance, monitoring, and maintenance activities including a timeline for completion and estimated budget. The budget items should come with a Class D breakdown. Provide the expectant lifespan of the structure with and without the recommended major modifications. Develop a seepage monitoring plan for Quinte Conservation to assess the seepage over time. Identify any imminent or future risks attributed to the seepage and recommend rehabilitation methods, costs and timeframes. MNRF 2011 Technical Bulletins should be followed for all aspects of the project scope. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
64
Bidding Soon
780
All Active Projects
373
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 30, 2024

img_map_placeholder

To Be Determined, Prince Edward, ON

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.