Published March 14, 2025 at 8:00 PM

Updated March 15, 2025

Renovation of an educational facility in Brea, California. Completed plans call for the renovation of a educational facility.

Response Format Electronic Bid Valid Liquidated Damages $250.00/Day Estimated Bid Value Start/Delivery Date March 2025 Project Duration March 2025 - July 2025 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% A) This specification section includes the engineering, fabrication, furnishing, delivery, and installation of new theatrical stage lighting equipment as specified in the 'Products' specifications and as indicated on the related stage lighting drawing documents for theauditorium stage. (Drawings 04.03.2024 Attached) B) Contract Documents and General Requirements apply to the work of this Section. C) All bidders shall fully inform themselves of the conditions under which the work is to be performed. No additional compensation shall be allowed for any labor or item the bidder could have been fully informed of prior to the bid date. D) While the components, quantities, and arrangements described herein and shown on the drawings indicate specific details for the realization of the stage systems, bidders may propose alternate details and components that will fulfill the functional parameters of the envisioned system. In such event, bidders shall submit a complete set of specifications and drawings, not less detailed than these and following the same general outline, together with a detailed statement indicating paragraph by paragraph wherein the equipment to be offered deviates from specifications included in this bid request. Where alternate proposals are offered they shall be submitted with the amount to be added or deducted from the base bid which is required from all bidders. Other Details SCOPE OF WORK (See Project Manual No CA23046) A) Work under this section consists of the installation of all materials and equipment necessary for the proper operation of all stage lighting equipment. Installation contractor shall furnish qualified personnel to test and adjust the equipment after installation until specified performance is attained. B) Preparation and submission of complete engineered shop drawings for approval by the Architect and Theatre Systems Consultant. C) Verification of conditions and dimensions at the job site. D) The adjustment and testing of the completed installation by the Contractor's personnel, subject to Architect and Theatre Systems Consultant's approval. E) Submission of required record documents. F) Coordination with other affected work, trades, and inspections. G) Installation work includes, but is not limited to the following: 1. New stage lighting relay and dimmer racks. 2. New stage lighting data distribution and lighting control processor racks. 3. New lighting control receptacle stations and low voltage control wiring. 4. New house lighting control stations and low voltage control wiring. 5. New stage manager's control panel and low voltage control wiring. 6. New worklight control stations and low voltage control wiring. H) Bid to assume all existing wiring is in good conidition and will not need to be replaced I) Bid to assume all existing wiring raceways marked as re-use will be in good condition and and adequate size for new cabling: Bid to assume fire alarm system has an existing raceway back to FACP Notes Checklist of Mandatory Forms: -Bid Form -Designation of Subcontractors -Non-Collusion Declaration -Bid Bond (or Bid Guarantee form if Security is other than Bid Bond) -Substitution Request Form (if Substitutions are being requested - If Substitution Request Form is not submitted then NO Substitutions will be allowed after the bids are opened) -Contractor's Certificate Regarding Workers Compensation -Certification Of Contractor And Subcontractor Division Of Industrial Relation Question Deadline 01/22/2025 at 12:00 PM PT

Award

Educational

$756,000.00

Public - City

Renovation

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

3

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
3
Bidding Soon
2,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 3, 2025

Project location map

789 Wildcat Way, Brea, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.