BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Brea, California. Working plans call for the renovation of a educational facility.

**As of September 06, 2024 bids received for this project were over the budget and was rejected. As of this time it is unknown if and when project will rebid. The District is soliciting bids for the installation of all materials and equipment necessary for the proper operation of stage lighting equipment. Prevailing Wage Project: Must be registered with the DIR and the CSLB. License Requirement: C-10 Electrical. The Contract Time to be determined with submittals, "tentative" start date of August/September 2024 and expected project completed December 2024. Failure to attend will be deemed as non-responsive. Contact rchampion@bousd.us with any questions. Liquidated Damages $250.00/Day Start/Delivery Date Estimated: September 2024 Project Duration Estimated: December 2024 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 06/28/2024 at 12:00 PM PT Online Q&A Yes SCOPE OF WORK Work under this section consists of the installation of all materials and equipment necessary for the proper operation of all stage lighting equipment. Installation contractor shall furnish qualified personnel to test and adjust the equipment after installation until specified performance is attained. Preparation and submission of complete engineered shop drawings for approval by the Architect and Theatre Systems Consultant. Verification of conditions and dimensions at the job site. The adjustment and testing of the completed installation by the Contractors personnel, subject to Architect and Theatre Systems Consultants approval. Submission of required record documents. Coordination with other affected work, trades, and inspections. Installation work includes, but is not limited to the following: 1. New stage lighting relay and dimmer racks. 2. New stage lighting data distribution and lighting control processor racks. 3. New lighting control receptacle stations and low voltage control wiring. 4. New house lighting control stations and low voltage control wiring. 5. New stage managers control panel and low voltage control wiring. 6. New worklight control stations and low voltage control wiring.

Final Planning

Educational

$1,221,000.00

Public - City

Renovation

35

11

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
121
Bidding Soon
2,210
All Active Projects
1,019
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.