BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Silverdale, Washington. Completed plans call for the renovation of a military facility.

Amendment 0003 provides answers to timely PPIs missed due to government personnel changes. The government determined a 4 ton unit was oversized for this space and has been changed to a 2.5 ton unit. The planned electrical panel is full and requires use of a different electrical panel 60 feet away. The Naval Sea Systems Command (NAVSEA), Naval Undersea Warfare Center Division Keyport, this solicitation is issued to procure construction services to install one ductless split unit system located at Bldg. 82. The Contractor shall provide labor, material, and equipment, as required, to accomplish the following work in accordance with the statements of work: Install one (1) new 4 ton ductless split units system with 4 indoor units, install new air diffusers. The new ductless systems will supply conditioned air to the NCIS area of Bldg. 82. Remove two (2) existing portable air conditioners and return the windows to functional condition. Performance location will be at Keyport, WA and Naval Base Kitsap - Bangor, Silverdale, WA. This solicitation is 100% set aside for small businesses. Magnitude of the Requirement: Between $35,000 and $100,000 Question Deadline 08/16/2024 Offerors who determine that the technical and/or contractual requirements of this solicitation require clarification(s) in order to permit submittal of a responsive technical proposal shall submit all questions in writing on a Pre-Proposal Inquiry (PPI) Form, Attachment 2. Inquiries shall be submitted via e-mail to james.k.wasson.civus.navy.mil. Submit only one inquiry per Form. Pre-proposals inquiries will be accepted up to ten (10) days prior to the due date of the proposals. A response will be provided via amendment to the solicitation. The Contractor shall begin performance within 10 calendar days and complete it within 180 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

3

13

6

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
31
Bidding Soon
895
All Active Projects
373
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

September 25, 2024

img_map_placeholder

1042 Tautog Cir, Silverdale, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.