BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in San Diego, California. Completed plans call for the renovation of a educational facility.

Kitchen Modifications Group 4 SCOPE OF WORK INCLUDES: - DEMO SINK AND CASEWORK - CLOSE OFF PASS-THROUGH WINDOW - NEW GREASE INTERCEPTOR - NEW FLOOR SINK - NEW THREE COMPARTMENT SINK - NEW FRP PANELING Locations- FLETCHER ELEMENTARY SCHOOL - 7666 BOBOLINK WAY, SAN DIEGO, CA 92123 HEARST ELEMENTARY SCHOOL - 6230 DEL CERRO BLVD, SAN DIEGO, CA 92120 Estimate: $590,000 - $745,000 Liquidated Damages Please refer to Supplementary Conditions in Bid Documents for project-specific liquidated damages. Board of Education Date: August 27, 2024 Start/Delivery Date 08/28/2024 Project Duration 157 days This is not a PSA project and does not require prequalification. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: B, or other appropriate license, subject to District approval. Bids may not be withdrawn by any bidder for a period of ninety (90) days after the electronic opening of bids. During this time, bidders shall guarantee prices quoted in their respective bid submissions. A successful bidder shall not be relieved of the bid submitted without the District's consent or bidder's recourse to Public Contract Code 5100 et seq. For information regarding bidding, please email jimperial@sandi.net Under Public Contract Code section 20111(b)(1), bids shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and a surety company or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of the bid value. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 06/17/2024 Pursuant to a board-approved resolution, the Bidder is required to satisfy a minimum DVB participation percentage of at least three percent (3%) for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$577,000.00

Public - City

Renovation

75

21

16

12

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
30
Bidding Soon
899
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 28, 2024

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.