BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Burlington, North Carolina. Completed plans call for the renovation of a educational facility.

Reference Number 0000354323 The project involves HVAC upgrades as described in the Request for Qualifications. Alamance-Burlington School System (Referred hereafter as "ABSS") is seeking proposals from qualified design-builders to perform design, planning, permitting (if required), and HVAC replacements at various schools. The intent of this RFQ is to select a design-builder based upon qualifications and cost to provide the required HVAC Upgrades. Question Deadline 06/14/2024 at 5:00 PM ET Questions regarding this RFQ should be submitted in writing to Designbuild@abss.k12.nc.us. Proposed Projects/Scope ("HVAC Upgrades") A. Graham High School (Year Constructed 1962) - The four individual buildings involved in the scope of work currently have three buildings that have split systems with eight 4-ton condensing units on the roof with air handlers with hot water coils above the ceiling in the hallway. One building has seven RTU's with hot water coils. Needs: Demo existing equipment and install VRF system along with a DOAS unit for each building. Anticipated project budget is $1,550,000. B. Southern Alamance High School (Year Constructed 1960) - The four individual buildings involved in the scope of work currently have split systems with eight 4-ton condensing units on the roof with air handlers with hot water coils above the ceiling in the hallway. Needs: Demo existing equipment and install VRF system along with a DOAS unit for each building. Anticipated Project Budget is $1,700,000. C. Haw River Elementary School (Year Constructed 1927) - The school currently has a failing hot water boiler. Needs: Demo existing Boiler and install new boiler. Anticipated Project Budget is $200.000. D. B. Everett Jordan Elementary School (Year Constructed 1968)- The school currently has a failing chiller. Needs: Demo existing chiller and install new chiller and chiller controls. Anticipated Project Budget is $320,000. E. Western Alamance High School (Year Constructed 1963) - The four individual buildings involved in the scope of work currently we have three buildings that have split systems with eight 4-ton condensing units on the roof with air handlers with hot water coils above the ceiling in the hallway. One building has six RTU's with hot water coils. Needs: Demo existing equipment and install VRF system along with a DOAS unit for each building. Anticipated Project Budget is $1,700,000. F. Eastern Alamance High School (Year Constructed 1963) - The four individual buildings involved in the scope of work currently we have three buildings that have split systems with eight 4-ton condensing units on the roof with air handlers with hot water coils above the ceiling in the hallway. One building has six RTU's with hot water coils. Needs: Demo existing equipment and install VRF system along with a DOAS unit for each building. Anticipated Project Budget is $1,700,000. G. Alexander Wilson Elementary School (Year Constructed 1923) - The school currently has a failing chiller. Needs: Demo existing chiller and install new chiller and chiller controls. Anticipated Project Budget is $320,000. H. Hillcrest Elementary School (Year Constructed 1994) - The school currently has a failing chiller and pumps. Needs: Demo existing equipment and replace chiller, pumps, piping modifications and chiller/pump controls. Anticipated Project Budget is $700,000. I. Marvin B. Smith Elementary School (Year Constructed 1995) - The school currently has a failing chiller and pumps. Needs: Demo existing equipment and replace chiller, pumps, piping modifications and chiller/pump controls. Anticipated Project Budget is $700,000. The HVAC Upgrades are to be turn-key completed ready for use with all electrical, HVAC and plumbing. The school system intends to issue the notice to proceed with work on August 15, 2024 and to allow approximately fifteen (15) months for the completion of the work. However, the desired completion date is no later than November 21, 2025. These proposed dates are subject to negotiation with the selected design-builder. The plans for the work must be reviewed and approved by DPI Plant Operation's section.

Post-Bid

Educational

$8,370,520.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
104
Bidding Soon
2,155
All Active Projects
855
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 25, 2024

August 15, 2024

img_map_placeholder

Multiple Locations, Burlington, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.