Renovation of a water / sewer project in Manchester, Connecticut. Working plans call for the renovation of a water / sewer project.

As of 6/27/2024 the project has been cancelled. Coupling and Venturi Meter Bolt Replacement The Town of Manchester is an equal opportunity employer and requires an affirmative action policy for all of its Contractors and Vendors as a condition of doing business with the Town, as per Federal Order 11246. By submitting the Proposal for this bid, all vendors and contractors agree to this condition of doing business with the Town, and should the Town choose to audit their compliance, the vendor agrees to cooperate fully. The Purchasing Authority reserves the right to waive any informality or reject any and all bids. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the Manchester Charter, Code of Ordinances, and Purchasing Guidelines. By bidding on the proposed purchase, the bidder agrees to such terms, provisions and conditions. An Equal Opportunity/Affirmative Action Employer Question Deadline 06/13/2024 at 4:00 PM ET Bidders shall submit all inquiries regarding this bid via online Commercial General Liability Insurance: With respect to the operations the Contractor performs and also those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Commercial General Liability insurance, including Contractual Liability, Products and Completed Operations, Broad Form Property Damage and Independent Contractors in an amount not less than $1,000,000 combined single limit, per occurrence, and $2,000,000 aggregate. Owner shall be included as additional insured. Per project aggregate to apply. The successful bidder shall furnish a surety bond for faithful performance of this Contract. The Performance Bond shall be equal to one hundred percent (100%) of the bid price and shall be furnished within ten (10) business days of the Notice of Award or prior to the start of Work, whichever comes first. The surety on such bond shall be a duly authorized surety company qualified to do business under the laws of the State of Connecticut and satisfactory to the Town. Project Location: Globe Hollow Water Treatment Plant 125 Spring Street Manchester, CT 06040 Contact Information Project Contact: Kevin Tait Field Maintenance Manager 125 Spring Street Manchester, CT 06040 Email: ktait@manchesterct.gov Phone: (860) 647-3208 Procurement Contact: Cora Narracci Purchasing Agent 494 Main Street Purchasing Department Manchester, CT 06040 Email: cnarracci@manchesterct.gov Phone: (860) 647-3033 Department: Water and Sewer Department Head: Patrick J. Kearney Director Scope of work: Due to the complexity of the repair, a mandatory pre-bid site visit is required. The site visit will be held on June 12, 2024 at 10:30 am at Globe Hollow Water Treatment Plant 125 Spring Street Manchester, CT 06040 Because the Water Treat Plant operations will be interrupted during the repair, work shall be done on a day of the week selected by the Manchester Water Department and must be done between the hours of 11:00pm to 7:00am. The contractor shall provide the necessary number of workers, with the proper tools and equipment to complete the entire project in the stated timeframe. Contractor shall follow all O.S.H.A safety requirements. Contractor will have a supervisor on site to direct workers as necessary. Proper ventilation must be maintained when existing 24 couplings are cut off pipe. Pipe must be properly braced and supported before the coupling removal work can begin to prevent any vertical or lateral movement to adjacent fittings. Pipe bracing and any other prep work can be completed during normal water department business hours, which are Monday through Friday 8:00am to 4:30 pm. Manchester Water Department staff will close valves to isolate the pipe and provide pumping to remove water from pipe gallery. Contractor will remove three (3) existing 24 Dresser style couplings. Then install three (3) new 24 split coupling on effluent pipe and torque to manufacturers specifications. New 24 couplings will be provided by Manchester Water Department. At the same location, contractor will also remove old bolts and nuts on a 24 Venturi flow meter and install (40) new - bolts and nuts. Bolts and nuts will be provided by Manchester Water Department. Bolts and nuts will be changed out with the Venturi

Final Planning

Water / Sewer

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
570
Active Projects
317
Bidding Soon
4,732
All Active Projects
2,197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2024

September 16, 2024

img_map_placeholder

125 Spring St, Manchester, CT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.