BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work and paving for a road / highway in Springdale, Arkansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Demolition of structure located at I-49 -Hwy. 265 (Springdale Bypass) Job 090621 FOB: Benton County Location(s) Benton, Arkansas Allows zero unit prices and labor Yes Allows negative unit prices and labor Yes Q & APrint Ask a Question Deadline 05/22/2025 04:00 PM EDT Remarks For Questions about the scope of work contact Cory Sutton 501-569-2318 or Katharine Gilbertson 501-569-2317. For questions about the bidding process contact Harvey Hargrove 501-569-2677. Demolition of structure located at I-49 - Hwy. 265 (Springdale Bypass), Route 612 Section 2,Benton County as per attached work list for Tract 210X. Job 090621 To meet the requirements of the Arkansas Department of Transportation Specifications attached to and made part of this bid. For questions about Bidding requirements contact Danny Keene (501-569-2674) For questions about job specifications contact Katherine Gilbertson (501-569-2317) or Cory Sutton (501-569-2318). Tract must be priced individually on the Work List but bid will be awarded by the Lumps Sum. Pricing for Additional Pay Items is on page 9 of attached Work List. (Additional pay item pricing will be on an as needed basis and does not obligate the Department to award any additional items.) Bid Bond will not be required of all bidders at time of bid opening.Performance Bond only (no checks of any kind allowed) in the amount of 100% will be required of successful bidder prior to providing goods/services.See Condition 4 on page 1 of Standard Bid Conditions. All work must be completed within 30 calendar days after issuance of the work order. Current Arkansas Contractor's License Number must be listed or bid will be rejected. (A.C.A. 17-25-101 et. seq.) The successful bidder will be required to submit Notice of Intent (NOI) to ADEQ. All records of the work performed and the disposal at an approved landfill (including the disposal receipt) shall be provided to ARDOT within 3 working days of the completion of the contracted work. All work must be completed within 50 caladar days after issuance of work order. Work not completed within this time frame shall result in the successful bidder being charged $120.00 per day until work is completed.

Award

Roads / Highways

$114,350.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
76
Bidding Soon
1,007
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2025

October 6, 2025

Project location map

AR-612, Springdale, AR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.