BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Iowa City, Iowa. Completed plans call for the renovation of a educational facility.

Scope: This project will renovate room 135 for storage of Landscape Services equipment and material. DESCRIPTION OF WORK A. This section applies to all work under the fire suppression contract. This shall include, but not necessarily be limited to, the following: 1. Water Based Fire Suppression Systems 2. Demolition of Fire Suppression Systems B. The work shall include all materials, equipment and labor required for complete and properly functioning fire suppression systems. C. Drawings for fire suppression work are diagrammatic, intended to convey the scope of work and indicate arrangement of equipment, piping and sizes and locations of equipment and materials. D. Where job conditions require reasonable changes in indicated locations and arrangements, make such changes without additional cost to Owner. E. Because of the scale of the drawings, certain piping or items such as unions or fittings may not be shown, but where such items are required by other sections of the specifications, or where they are required by the nature of the work, they shall be furnished and installed. F. All elements of the construction shall be performed by workmen skilled in the particular craft involved, and regularly employed in that particular craft. All workers must possess State of Iowa Fire Marshal Fire Protection System Installer Certifications. Sprinkler contractor must have office within 125 mile radius of Iowa City limits G. All work shall be performed in a neat, workmanlike manner in keeping with the highest standards of the craft. Coordinate with project manager about loud work times, elevator usage, and protection of objects. All work shall be pre-inspected by job foreman prior to inspection final checkout. H. Where partial ceilings clouds are provided for architectural reasons, special attention shall be made to the design of the sprinkler system. Heads both above and below the ceiling shall be required where the ceiling is not continuous. I. Where lab benches, library stacks, shelving systems and other permanent furniture, equipment, fixtures or partitions extend within 18 inches of the ceiling, design the sprinkler head layout specifically to coordinate with the layout, lighting, ventilation, and other building features. J. Grid systems and looped systems are discouraged as they provide less long term flexibility.

Award

Educational

$340,200.00

Public - State/Provincial

Renovation

21

24

6

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
36
Bidding Soon
480
All Active Projects
222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 31, 2024

img_map_placeholder

S Madison St, Iowa City, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.