Published April 15, 2025 at 8:00 PM
Updated October 1, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in East Central Franklin, Maine. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
This project requires the removal and replacement of the existing bridge structure over the Quick Stream. The on-Site construction process will include, but not be limited to, mobilization, establishment of a second means of access, installation of the sediment control barriers and buffers, removal of the existing superstructure, removal of the existing substructures, excavation for and installation of the new abutments, reconstruction of the stream banks at the abutments, restoration of the stream bed up- and downstream, installation of the abutment armament, installation of the bridge superstructure, regrading the road and shoulders, reseeding all other areas, removal of the sediment control barriers and buffers, then cleanup and demobilization. The on-Site construction period will require two to three months. All in-stream and below stream work will occur between July 15th and September 30th. All in-water work will occur during the in-water work window. Silt fencing will used in all areas where sediment transport would move toward the stream. Adequate sediment controls shall be installed and maintained throughout the construction process per MDEP BMP. All sediment collected will be relocated to a nearby spent gravel pit. Floating silt fence will be used along the stream edges. NO equipment shall be used in the water. Contractor will observe the Spill Prevention Control & Countermeasures to protect the stream. No refueling will occur within 250 feet of the stream. Loam, seed, and/or mulch will be placed immediately after construction is complete. The contractor shall be MDEP certified for erosion and sediment control practice. Contractor Q&A period extend from the period Advertisement to 5:00 pm EDST Wednesday, March 26, 2025. Contact George Bell, Project Manager, directly at 207.416.9591 with any scheduling questions. The project's in-stream work shall be completed between July 15, 2025 and September 30, 2025. All bids must be accompanied by a duly signed and executed bid bond for the amount of 5% of the total bid. The Franklin County Commissioners reserve the right to accept or reject any or all bids and to waive formalities. No proposal may be withdrawn for at least 30 days after receipt of proposals.
Award
Bridges / Tunnels
$700,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 08 - Openings
Division 10 - Specialties
Division 12 - Furnishings
Division 22 - Plumbing
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 35 - Waterways and Marine Construction
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
July 15, 2025
Reed Rd, East Central Franklin, ME
Related To This Project
East Central Franklin, ME
--
East Central Franklin, ME
--
Kittery, ME
Bid Date: Jun 21 2024
Portland, ME
Bid Date: Jun 25 2024
Kittery, ME
Bid Date: Jul 09 2024
Skowhegan, ME
Bid Date: Aug 14 2024
Falmouth, ME
--
Falmouth, ME
--
Bangor, ME
Bid Date: Jun 20 2024
Lewiston, ME
Bid Date: Jun 13 2024
Biddeford, ME
Bid Date: Jun 03 2024
Portland, ME
Bid Date: Jun 13 2024
Augusta, ME
Bid Date: Sep 09 2021
Biddeford, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.