Renovation of a transportation facility in Portland, Maine. Completed plans call for the renovation of a transportation facility.

Installation of Fixed Walkways and Passenger Boarding Bridges Gates 11, 12 & 14 This project will replace the existing ground boarding operations for Gates 11, 12 and 14 with a new fixed walkway and passenger boarding bridge configuration at the three (3) gates. The project includes site work, concrete foundations, utility relocations, utility extensions, new ground support equipment (400Hz Ground Power Units, Pre-conditioned Air Units, and Potable Water Cabinets), modifications to an existing maintenance and storage building Rubb(TM) Building, and other work as shown on the plans and specified herein. Bid security in the amount of five percent (5%) of the total bid must be submitted with the bid. the bid security may be either a certified check (only if the bidder utilizes USPS, UPS, or FedEx to submit their bid) or a proposal guaranty bond executed by a surety company authorized to do business in the State of Maine (for electronic bid submissions). Bid security shall be made payable to the City of Portland, Maine. Bids submitted without security will not be considered. Each prospective bidder will be required to obtain from the City each copy of the proposal form and each set of plans The successful bidder must furnish: A 100% performance bond, A 100% labor and material payment bond, And begin execution of this contract within ten (10) calendar days following the Notice to Proceed. This project is funded, all or in part, with a grant from the U.S. Department of Transportation (DOT), Federal Aviation Authority (FAA). With this funding, this project is subject to the Build America, Buy America Act (BABAA). Please see Section A4 of the Federal Contract Provisions included with the bid documents for details on the requirements of this Act. SCOPE OF WORK A. As part of the construction, furnish and install Overbridge device assemblies as required to provide the means by which power, control and signaling wiring is extended from junction boxes mounted on the exterior of the Terminal/Gate position and the various units mounted along the length of the Passenger Loading Bridge subject to extension and retraction

Post-Bid

Transportation Terminals

$450,000.00

Public - Federal

Renovation

70

21

19

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
36
Bidding Soon
736
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

img_map_placeholder

1001 Westbrook St, Portland, ME


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.