BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Arminto, Wyoming. Completed plans call for the renovation of a military facility.

The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The principal components of work include removal of three (3) power circuit breakers two (2) oil and one (1) SF6 gas, four (4) disconnecting switches, one (1) disconnection switch with ground blades and one (1) coupling capacitor voltage transformer and its associated structure, and four (4) existing control relay panels AND installation of two (2) SF6 gas power circuit breakers, three (3) side-break disconnecting switches, cable trench, cable entry box, cable ladder and new penetration into service building, service building cable tray, three (3) control relay panels, and associated electrical equipment, site development and control building modification for Heart Mountain Breaker and Switch Replacement. The project location is in Cody Wyoming, and the anticipated period of performance is 550 calendar days after Notice to Proceed. The estimated magnitude of construction is between $500,000 and $1,000,000. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 13 June 2024 at the following sites: https://www.fedconnect.net and https://www.sam.gov. NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material. Please see the link for Construction Change Order Definitization Notices - https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx Delivery: 550 Days After Notice to Proceed Question Deadline 06/27/2024 Any questions to be answered during the site visit must be submitted via email Joseph (Jay) Magbitang/ magbitang@wapa.gov if you intend to attend the site visit. Rmr Procure Construction Contractor for Hm Breaker and Switch Replacement Project

Post-Bid

Military

$1,000,000.00

Public - Federal

Renovation

59

8

73

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
1
Bidding Soon
35
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 29, 2024

img_map_placeholder

To Be Determined, Arminto, WY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.