BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Leavenworth, Kansas. Completed plans call for the renovation of a fire / police facility.

HVAC Replacement at Fire Station #1 Project Goal & Scope of Services: In an effort to improve the operating efficiency and comfort of fire staff and employees, the city of Leavenworth is seeking a qualified HVAC contractor to facilitate the replacement of portions of the current HVAC system in operation at Fire Station No. 1. The overall goal of the project is to install an HVAC system that is responsive to year-round temperature fluctuations within the workplace. The scope of work for this facility will consist of: 1. Removing the existing York condensing unit and installing a new unit of like and kind to replace it (see Acceptable Manufactures below). The current unit is experiencing various issues including oil return issues, breakers tripping, fuses blowing etc. and has generated multiple calls in the past couple of years. The new unit must be of higher efficiency and be an engineered approach with city approved drawings prior to the replacement. The new unit will be dual circuited like the existing unit and utilize low-ambient controls for mild weather operation. 2. A new coil capable of handling the new unit refrigerant, (R-410A) will be installed in place of the existing coil. The new coil shall have new expansion valves, new filter driers and new solenoid valves for each circuit. 3. The existing AHU motor is making some noise, this motor shall be replaced with a Baldor motor of the same horsepower and RPM. The new motor must be an inverter duty motor rated for being utilized with a variable frequency drive. 4. Air test and balance prior to the start of the work and at the completion of the work with a full report provided to the city of Leavenworth. 5. All new equipment must be integrated into the current control system and be equal or better than existing by the same controls manufacture and contractor. All control system work must be a part of the final project pricing.

Post-Bid

Fire / Police

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
35
Bidding Soon
751
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 29, 2024

img_map_placeholder

To Be Determined, Leavenworth, KS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.