BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2024 at 8:00 PM

Updated July 30, 2024

Demolition, site work, paving and new construction of a mixed-use development in Sturgeon Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

20240709002. 4150-26-71 WISC 2024378 Mid Junction - Baileys Harbor, STH 42 - Summit Road, STH 057 Door County Work Summary: Grading, Base, Milling, Asphalt Pavement, Asphalt Pavement, Culvert Pipe, Curb and Gutter, Storm Sewer, Guardrail, Bridge Replacement, Box Culvert Replacement, Pavement Markings. Work Type: AF DBE Goal: 9% Guaranty Required: $75,000.00 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Unless otherwise specified in this advertisement, the Department will issue bidding proposals only to those who have established their qualifications for the work to be bid upon. Any prospective bidder who has not established their qualifications must file a sworn statement with the Department not less than ten business days prior to the time set for submitting bidding proposals on a form furnished by the Department. Question Deadline 07/08/2024 at 11:45 AM CT Any question submitted after 2 p.m. the Thursday prior to the letting may not have sufficient time to prepare a thorough response or develop a contract addenda. Completion Date Contract: November 06, 2025 WI DOT - 002 - Mid Junction - Baileys Harbor MBE (1.0%), WBE (6.9%), DBE (9%)

Award

Roads / Highways

$3,257,378.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

276

5

5

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
48
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

Project location map

WI-57, Sturgeon Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.