BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2024 at 8:00 PM

Updated July 25, 2024

Site work for a civil project in Winchester, Massachusetts. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

As of July 24, 2024, project was awarded, start date is August. Aberjona River Flood Mitigation Program Project 10 - Muraco School Culverts Project location 33 Bates Road, Winchester, MA Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. All telephone calls and correspondence in connection with this Project should be addressed to Luke Boucher, PE, at 401-457-7838 or be emailed to lboucher@vhb.com. The due date for bidder questions is July 1, 2024.

Award

Water / Sewer

$8,723,550.00

Public - City

Site Work

14

15

19

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
580
Active Projects
324
Bidding Soon
4,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

July 22, 2024

Project location map

33 Bates Rd, Winchester, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.