BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Andreas, California. Conceptual plans call for site work for a water / sewer project.

Design services for the proposed Sawmill Tank Replacement Project shall include the minimum design elements. 1. Design of two ANSI/AWWA D103 coated bolted carbon steel tanks each with an operating capacity of 0.5 MG. Tank interior and exterior surfaces shall be glass fused to steel per D103-9 12.4 with a clear span aluminum cover. The glass encapsulation of the steel panels shall be on all sheet edges, the tank shall be designed not to require any external belly straps. The cathodic Protection system shall include sacrificial anodes. Tank mixing systems shall be provided within the tank on common feed-fill lines to maximize circulation and water age. 2. Each tank minimum and maximum water elevations shall match to permit single or combined tank operation. 3. Both tanks shall be designed to comply with California Department of Drinking Water requirements, aka AWWA recommendations, concerning potential impact from a design seismic event including tank movement, water movement inside the tanks, and horizontal and vertical movement of inlet and outlet piping. 4. Tank foundations shall consist of concrete ring wall with an embedded wall starter sheet and concrete tank floor 5. Replacement tanks and associated improvements shall be designed to utilize the existing pump station located at the site. 6. The design improvement shall maintain operation of the existing Sawmill Tank during construction. 7. Demolition of existing tank 3.0 MG performed upon completion and operation of the two new water storge tanks. Design and construction of the project is budgeted for Fiscal Year (FY) 2024-25 and 2025-26 with construction completed by October 2025. Due to potential weather-related conditions at the project site, construction activities are to occur beginning in May and end in September of the respective year. Therefore, based upon project budgeting and weather-related construction limitations, the District anticipates the following project schedule. Project Construction April thru October 2025 Construction Completion and As-Built Documents November 2025 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$200,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
35
Bidding Soon
1,122
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

img_map_placeholder

To Be Determined, San Andreas, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.