Site work and renovation of a water / sewer project in Manalapan, New Jersey. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Digester Facility Complex Upgrade Project. Question Deadline 08/22/2024 at 5:00 PM ET Bidder questions shall be submitted in writing to Richard Padgitt, P.E., at rpadgitt@psands.com by Questions received will not be answered. Only questions answered by formal written addenda or clarifications will be binding. Oral and other interpretations will have no binding legal effect. The Work shall be completed within 1095 calendar days from the date of the Notice to Proceed. This Contract is expected to be funded in part with funds from the New Jersey Department of Environmental Protection and the New Jersey Environmental Infrastructure Trust. Neither the State of New Jersey, the New Jersey Environmental Infrastructure trust, nor any of their departments, agencies or employees is, or will be, a party to this Contract or any lower tier contract or subcontract. The Western Monmouth Utilities Authority's Digester Facility Complex Upgrade Project will occur at their Pine Brook Wastewater Treatment Plant (WWTP) located in Manalapan, New Jersey. The work required under the Contract shall consist of, but is not limited to, the replacement of aging equipment, and improvement upon the performance of the anaerobic digestion system. The improvements will include application of a concrete corrosion coatings system for the internal concrete structures associated with the primary and secondary digesters including their associated overflow boxes, new radial beam gas holder floating covers for the primary and secondary digesters including thermal insulation system, new linear motion mixing system for the secondary digester and modifications to the existing linear motion mixing system for the primary digester, new sludge heat exchangers, new sludge and digester gas piping systems, new process and instrumentation control systems, new potable and service water piping systems, concrete repairs, site work, and HVAC, architectural, and electrical system upgrades. (collectively, the "Work"). No specific license information provided in the text. Bidder must submit a certified check, cashier's check, or bid bond in the amount of 10% of the bid not to exceed $20,000. Upgrade of the Digester Facility Complex including replacement of aging equipment and improvement of the anaerobic digestion system The successful Bidder will be required to submit bonds and proof of insurance before execution of the Contract. All bids and accompanying documents, as well as the insurance certificates, bonds and other contract documents, are subject to review by the Authority Attorney to ensure compliance with New Jersey laws and regulations. The Authority will evaluate bids and any award will be made to the lowest responsive and responsible Bidder. The Authority reserves the right to reject any and all bids, in accordance with applicable laws, and to waive any minor immaterial informalities therein and to accept any bid in accordance with the Local Public Contracts Law, N.J.S.A. 40A:11-1 et seq. Bidders are solely responsible for the timely delivery of the bids and no bids shall be considered which are presented after the public call for receiving bids. Any bid received after the date and time specified will be returned, unopened, to the bidder. Bids must be based upon and in strict accordance with the Bid Documents. Bids that do not provide the required documents as detailed in the Bid Document Submission Checklist will not be deemed responsive and may be rejected.

Award

Water / Sewer

$19,243,496.00

Public - County

Renovation, Site Work

115

24

4

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Resurfacing of Precast Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Structural Post-Tensioned Concrete, Cast Decks and Underlayment, Lightweight Concrete Roof Insulation, Lightweight Insulating Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Acoustical Ceilings, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Enclosed Bus Assemblies, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Hooks, Lifts

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
291
Bidding Soon
4,883
All Active Projects
2,369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

October 14, 2024

img_map_placeholder

To Be Determined, Manalapan, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Digester Facility Complex Upgrade Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.