Site work, paving and renovation of a mixed-use development in Miami, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the renovation of a water / sewer project; and water / sewer project.

SCOPE OF WORK: The Biscayne Bay Water Quality Characterization and Pollution Reduction, Phase II, Miami Dade County (MDC) Project Scope of Work for this contract consists of furnishing all supervision, labor, materials, tools, equipment and performing all operations required to construct the work in accordance with the contract documents. Work includes but is not limited to the construction and installation of drainage structures, drainage stormwater treatment systems, regrading swale, miscellaneous drainage improvements, driveway restoration, grading, sodding, and miscellaneous roadway restoration including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. The Contractor shall abide by all conditions set forth on all the approved permits from Federal, State, and Local governments that pertain to this project. The five (5) proposed sites are located at: Project Site #1 - NW 32nd Avenue from NW 99th Street to NW 106th Street The proposed improvements consist of installing one (1) Ecovault structure by EcoSense International and twenty-five (25) SOP Filter Baskets designed to remove solids, Total Nitrogen (TN), Total Phosphorus (TP) and bacteria from stormwater runoff prior to discharge to the Little River C-7 Canal. Project Site #2 - NW 22nd Avenue from NW 94th Street to NW 105th Terrace The proposed improvements consist of installing forty (40) Stormwater Curb Inlet Screens by SOP Technologies and one (1) Jellyfish Filter designed to remove solids, Total Nitrogen (TN), Total Phosphorus (TP) and bacteria from stormwater runoff prior to discharge to the Little River C-7 Canal. Project Site #3 - NW 17th Avenue from NW 89th Street to NW 98th Street The proposed improvements consist of installing one (1) Hydro DryScreen structure and thirty-nine (39) Stormwater Curb Inlet Screens designed to remove solids, Total Nitrogen (TN), Total Phosphorus (TP) and bacteria from stormwater runoff prior to discharge to the Little River C-7 Canal. Project Site #4 - NW 12th Avenue from NW 88th Street to NW 83rd Street, and NW 83rd Street from NW 15th Avenue to NW 12th Avenue The proposed improvements consist of installing forty-four (44) StormBasin filters designed to remove solids, Total Nitrogen (TN), Total Phosphorus (TP) and bacteria from stormwater runoff prior to discharge to the Little River C-7 Canal. Project Site #5 - North Miami Avenue from NW 71st Street to NW 91st Street The proposed improvements consist of installing forty (40) Stormwater Curb Inlet Screens and six (6) Stormwater Filter Baskets by SOP Technologies and two (2) Ecovault structures by EcoSense International designed to remove solids, Total Nitrogen (TN), Total Phosphorus (TP) and bacteria from stormwater runoff prior to discharge to the Little River C-7 Canal. The proposed work must be performed by qualified personnel and in a professional and workmanlike manner in accordance with industry standards and practices. Any questions regarding interpretation or clarification to project shall be submitted via email to mario.lopez2@miamidade.gov, jess.humyn@miamidade.gov, and rocio.soto@miamidade. gov with a copy to clerk.board@miamidade.gov . Each such request must be received at least five (5) working days before the submittal date as established in the Project advertisement or as formally amended, in order that interpretation or clarification be issued in the form of written addenda, emailed, mailed or delivered to all prospective Contractors. ESTIMATED COST: $1,363,635.96

Post-Bid

Sidewalks / Parking Lot

$1,363,636.00

Public - County

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
51
Bidding Soon
1,107
All Active Projects
455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.