BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Site work for a medical facility in Uxbridge, Ontario. Completed plans call for site work for a medical facility.

Oak Valley Health has been working closely with the Ministry of Health to bring forth a hospital that is up to the latest design, functionality and standards. In order to facilitate the construction of the hospital, there are initial site works that are included in this scope of work. The purpose of the Early Works Phase is to commence with the relocation of critical hospital infrastructure and the construction of siteworks to prepare the new building site for construction, while providing secondary construction access to reduce the impacts to existing hospital and Oak Tree Medical Building operations. This is the first phase of construction for the new campus, which includes a new hospital, new long-term care building and the existing Oak Tree Medical building. The early works aim to prepare the site for the construction of the hospital and the Long-Term Care facility. The scope of work highlighted in the design documents includes but is not limited to: extension of site services, construction of a service road, storm water management and other pieces of work highlighted. The early works will be constructed in two phases as defined in the bidding documents. During the first phase, installation of new site services, retaining wall and road construction, stormwater infrastructure and new parking areas will be constructed, along with the civil, electrical and structural works required to accommodate a new high-voltage sub-station. The procurement and installation of the sub-station and related electrical feeds will occur in phase 2. Phase 1 construction will be completed by October 31, 2025. Phase 2 activities are expected to commence later so that the substation installation is aligned with the construction of the Long-Term Care Facility, which will be the second stage of campus construction. Substantial completion of the project, estimated to be on or around November 2025 for Phase 1 and between June and September 2027 for Phase 2, or upon mutual agreement that the work as defined in the contract is completed. The commencement and completion dates may be adjusted to align with project and/or administrative requirements by the Purchaser. Oak Valley Health (OVH) invites all qualified contractors to submit their qualification and pricing proposals for the OVH Early Works for Uxbridge Redevelopment Project. The project scope includes bringing forth a hospital that is up to the latest design, functionality and standards. In order to facilitate the construction of the hospital, there are initial site works that are included in this scope of work. *Ground breaking occurred June 10, 2025. Construction in 2 phases, in 2025 & 2027. **Award value is unreleased.

Under Construction

Medical

$8,900,000.00

Public - State/Provincial

Site Work

31

26

44

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
241
Bidding Soon
4,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

June 10, 2025

Project location map

4 Campbell Dr, Uxbridge, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.