Published August 14, 2026 at 8:00 PM
Updated August 20, 2026
Site work and renovation of a transportation facility in Appleton, Wisconsin. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.
https://www.wearegreenbay.com/news/local-news/take-a-tour-of-appleton-airports-upcoming-expansion-phased-completion-expected-in-spring-2025/ APPLETON, Wis. (WFRV) – The $66 million expansion project at the Appleton International Airport is on schedule, and media members were given a tour of the facility Wednesday afternoon. Set for 47,000 square-feet, the expansion will more than double the size of the airport as it looks to provide greater service to over one-million passengers that come to and from the airport on a yearly basis. According to a release, part of the project will be operational when the 2025 NFL Draft arrives, and the gate area will be expanded to 10. In additional, a connection will be established between old and new gates so there are more seating areas for boarding passengers. Some of the renderings and photos of the construction project were provided as well. “This day is the beginning of the future of air travel for Northeast Wisconsin,” Appleton Airport Director Abe Weber said. “We are on pace to serve an anticipated 948,000 arrivals and departures by the end of this year and an expansion such as this will help us easily top the one-million mark.” Future phases of the project will be to expand ticketing and baggage claim areas. TSA data shows that the Appleton airport is the fastest growing in Wisconsin. _____________________________________________________________________________________________________________________________ https://www.whby.com/2024/08/08/appleton-internation-airport-terminal-expansion-on-course/ Appleton International Airport terminal expansion on course (VIDEO) By Terry Kovarik Aug 8, 2024 | 6:01 AM NEENAH, WI — The expansion of Appleton International Airport is on course for completion weeks before the 2025 NFL Draft in Green Bay. Fliers and residents are in for unique experiences whether they’re flying out of town or just visiting. WHBY’s Terry Kovarik shows us how far the project has come in this video report. _____________________________ Base Bid: Install two (2) separate microgrid systems; one at Public Safety with ~100kWDC/88kWAC ballasted ground mount PV system, 100kW/100kWh BESS, and two 19.2kW Level 2 dual port EV chargers; and one at Appleton Flight Center with ~100kWDC/78kWAC rooftop mounted PV system, 50kW/50kWh BESS, and one 19.2kW Level 2 dual port EV charger. Alternate A: Additional ~100kWDC/88kWAC ballasted ground mount PV system at Public Safety Alternate B: Additional 50kW/50kWh BESS at Appleton Flight Center Alternate C: Additional 50kW/50kWh BESS at Appleton Flight Center Alternate D: Additional 19.2kW Level 2 dual port charger at Appleton Flight Center Estimate of major quantities: Base Bid: Public Safety Microgrid and Appleton Flight Center Microgrid, Lump Sum Alternate A: Additional ~100kWDC/88kWAC ballasted ground mount PV system at Public Safety, Lump Sum Alternate B: Additional 50kW/50kWh BESS at Flight Center, Lump Sum Alternate C: Additional 50kW/50kWh BESS at Flight Center, Lump Sum Alternate D: Additional 19.2kW Level 2 dual port charger at Appleton Flight Center, Lump Sum DBE Goal: None Assigned Contract Completion Time: 60 Working Days, see specials Proposals: Proposal forms are included with the plans and specifications, and are subject to the provisions of Wis. Stat. 66.0901(7). A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, bank's draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. The electronic template will allow the following options for meeting the proposal guaranty. E-Verify bid bond (Surety2000 & SurePath), uploading a copy of the bid bond or certificate of annual bid bond, certified check, bank draft, or money order. Any bid security, other than a E-verified bond or certificate of annual bid bond is provided, the department will require that the apparent two lowest bidders to mail or hand-deliver the original bond, certified check, bank draft, or money order to the Bureau of Aeronautics by close of businesstwo business days following the close of bids and must be received by the Bureau of Aeronautics no later than 5 days from the posting of the bid results. Any prospective bidder who has not previously established their qualifications must file a pre-qualification statement on the proper forms and be received by the department no later than 12:00 noon, local time, Friday, May 31 st , 2024. Only prime or general contractors submitting the bid need to be prequalified; subcontractors do not need to be prequalified For further information or to request a Microsoft Teams Meeting invite, contact Aaron Stewart via email at aaron.stewart@westwoodps.com or call (920) 830-6177. Outagamie County, Wisconsin Represented by Craig Thompson, Secretary Department of Transportation Sponsor's Authorized Agent
Award
Transportation Terminals
$3,555,146.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2024
July 15, 2024
w6390 Challenger Dr, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Jun 25 2024
Appleton, WI
Bid Date: Jul 02 2024
Appleton, WI
Bid Date: Jul 10 2024
Appleton, WI
Bid Date: Jul 25 2024
Appleton, WI
Bid Date: Jul 03 2024
Appleton, WI
--
Appleton, WI
Bid Date: Jul 30 2024
Appleton, WI
--
Appleton, WI
Bid Date: Jun 13 2024
Appleton, WI
Bid Date: Jun 26 2024
Appleton, WI
Bid Date: Jun 19 2024
Appleton, WI
--
Appleton, WI
--
Appleton, WI
Bid Date: Jun 11 2024
Appleton, WI
Bid Date: Jun 11 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.