BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Bidder shall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: Improve Ridgewood Dr from N Clinton to Newport Ave by removing chip and seal street and replacing it with asphalt. Also, new concrete curbs, sidewalks, streetlights, and drive approaches will be constructed with storm drainage improvements. Finally, restoration of disturbed areas. No bid may be withdrawn after the scheduled time for receipt of bids for at least ninety (90) days to allow review of bids before announcing award of contract. The successful bidder may be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. Question Deadline 06/14/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Greg McDirmit: (260) 427-2764 or greg.mcdirmit@cityoffortwayne.org 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than four days prior to the date for opening of Bids may not be answered The City's goal for qualified Emerging Business Enterprise (E.B.E), as subcontractors on this project is ten percent (10%) of the contract amount

Award

Roads / Highways

$1,189,950.00

Public - City

Outdoor Lighting, Paving, Site Work

21

31

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
22
Bidding Soon
592
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

img_map_placeholder

Ridgewood Dr, Fort Wayne, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.