Site work for a road / highway in Lyon Township, Michigan. Completed plans call for site work for a road / highway.

The Crawford County Road Commission will receive sealed bids for the following item of work: Clearing and Grubbing Removal of all trees and brush, stumps and debris within a 66' wide x 5,280' road right-of-way, approximately 2 acres, more or less. Removal of all trees and brush, stumps and debris within a 66' wide x 5,280' road right-of-way LeLine Road; from M-18 to Pioneer Road, located on the section line, common to sections 33 and 34, T25N, R2W South Branch Township, Crawford County, Michigan. LeLine Road; from M-18 to Pioneer Road, located on the section line, common to sections 33 and 34, T25N, R2W South Branch Township, Crawford County, Michigan. Project Completion Date: August 13, 2024, unless a different date is authorized by the Crawford County Road Commission. The contractor shall provide Certificate of Insurance prior to commencing work. Certificate shall include: 1) Board of County Road Commissioners AND the Crawford County Road Commission named as additional insured to all coverage, 2) Bodily Injury Liability - each person - $500,000.00 each occurrence, 3) Bodily Injury Liability - each accident - $1,000,000.00, 4) Property Damage Liability - each accident - $1,000,000.00, 5). Single Limit Policy - $1,000,000.00 and 6) Worker's compensation- statutory limits. General Specifications: Clearing and Grubbing Removal of all trees and brush, stumps and debris within a 66' wide x 5,280' road right-of-way. Approximately, 2 acres, more or less. LeLine Road; from M-18 to Pioneer Road, located on the section line, common to sections 33 and 34, T25N, R2W South Branch Township, Crawford County, Michigan. The bidder shall indicate total Lump Sum payment. The work is for the removal of all trees and brush, stumps, and debris, located within the project limits. All work is confined within the 66-foot-wide right of way. Do not cut the marked boundary lines trees. Use of Private Property shall not be permitted unless with written permission by the Landowner. A copy of written permission shall be provided to the Crawford County Road Commission office prior to work. Contractor is required to have written permission from landowner to place any fill, trees, stumps, or debris on private property. A copy of the permission slip shall be provided to the Road Commission office prior to work. Project limits shall be provided by the Crawford County Road Commission and shall indicate same by staking and additional side markings with orange ribbon and or paint. An on-site conference between the contractor and the Crawford County Road Commission is required before work begins. Contractor to remove all debris from Road R.O.W. including trees, brush, stumps. Care should be taken to preserve any property surveys or concrete monuments. If requested by an adjacent landowner, all firewood shall be left outside of the right-of-way. This wood shall be cut into lengths no less than eight feet, having a diameter of at least six inches. Except in areas to be excavated, stump holes and other holes from which obstructions are removed shall be backfilled with suitable material. Burning of perishable material shall be done in accordance with applicable laws, ordinances, rules, and regulations. All necessary permit approvals shall be obtained prior to burning. Unless burned in accordance with the requirements herein, perishable materials and debris shall be removed from the right-of-way and disposed of in accordance with local regulations. The traveled portion of the roadway shall be restored to its original condition or better at the end of each day's work. The contractor shall not be allowed to shut down segments of the roadway when working. Roadway must be opened to traffic at the end of each day's work. The contractor shall provide the Road Commission with a traffic control plan prior to commencement of work. Traffic Control Devices and flagmen shall be the responsibility of the Contractor. Traffic shall always be maintained unless otherwise agreed upon. All construction signing and traffic control shall meet the 2011 Edition of the MMUTCD. All contractors must comply with MIOSHA safety standards and regulations. Project Completion Date: August 13, 2024, unless a different date is authorized by the Crawford County Road Commission. The Board reserves the right to reject any or all bids, to waive informalities in the bids and to award the bid deemed to be in the best interest of Crawford County.

Award

Roads / Highways

$37,500.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
55
Bidding Soon
648
All Active Projects
223
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 20, 2024

July 22, 2024

August 13, 2024

img_map_placeholder

Leline Rd, Lyon Township, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.