Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 6, 2025 at 7:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Longwood, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Engineering Design Services for W. Warren Ave Complete Streets It is the intent of the City of Longwood hereinafter referred to as the CITY, to request proposal(s) from pre-qualified firms to perform Engineering Design services for the West Warren Avenue Complete Streets Project. The City of Longwood has received federal highway funding through the Florida Department of Transportation (FDOT) Local Agency Program (LAP) to complete the West Warren Avenue Complete Streets Design FPID446488-1-38-01. The City of Longwood wishes to contract the Engineering Design services related to this project from a firm pre-qualified by Florida Department of Transportation in Work Types: 3.2: Major Highway Design, 6.1: Traffic Engineering Studies 7.1: Signing, Pavement Marking, and Channelization 8.1: Control Surveying 8.2: Design, Right of Way, and Construction Surveying 9.1: Soil Exploration 9.2: Geotechnical Classification Lab Testing 15.0: Landscape Architect The Method of Contractor Selection Has Not Been Determined at This Time. The City of Longwood will receive sealed bids/proposals from qualified firms to furnish the goods and/or services identified in the specifications document. - Enhance connectivity and accessibility between all modes of transportation, activity centers, and neighborhoods surrounding West Warren Avenue - Create a safe and supportive environment for walking and hiking - Create a multi-modal vision and plan that supports the citys economic development initiatives - Develop a set of implemental improvements (alternatives) in the study area that can be designed and constructed
Conceptual
Sidewalks / Parking Lot
$500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2026
W Warren Ave, Longwood, FL
Related To This Project
Longwood, FL
--
Longwood, FL
Bid Date: Oct 09 2024
Longwood, FL
Bid Date: Aug 19 2024
Longwood, FL
Bid Date: Sep 12 2024
Longwood, FL
Bid Date: Oct 09 2024
Longwood, FL
Bid Date: Nov 20 2024
Longwood, FL
Bid Date: Dec 13 2024
Longwood, FL
Bid Date: Aug 07 2024
Longwood, FL
Bid Date: May 16 2024
Longwood, FL
Bid Date: May 01 2024
Longwood, FL
Bid Date: Apr 10 2024
Longwood, FL
Bid Date: Mar 27 2024
Longwood, FL
Bid Date: Apr 03 2024
Longwood, FL
Bid Date: Feb 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.