BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2024 at 7:00 PM

Updated November 6, 2024

Site work for a mixed-use development in Hebron, Kentucky. Completed plans call for site work for a transportation facility.

** As of 11/5/2024 Project is not awarded yet. A timeline for the award has not yet been established.** Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A Yes Q&A Deadline September 16, 2024 11:59 PM (EDT) Contact Info Contract & Procurement Administration 859-767-7900 procurementcvgairport.com The Project includes removal and replacement of the generator diesel fuel Underground Storage Tank (UST) at Concourse B (UST #8) with a new 2,000-gal UST, the removal and replacement of the generator diesel fuel UST at Concourse A North (UST #9) with a new 2,000-gal UST, and the closure in place of the generator diesel fuel UST at Concourse A South (UST #10) and installation a new 500-gal AST. Preference for Kentucky resident bidders will be applied in accordance with Kentucky law. The Owner, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The Owner reserves the right to waive any informality or irregularity in any bid or bid guaranty, to reject any or all bids, to award or refrain from awarding a contract for the work, and to negotiate with the apparent qualified responsible bidder to such extent as may be beneficial to the Owner. Goals for minority participation for each trade 11% Goals for female participation in each trade 6.9% DESCRIPTION OF WORK 1. The intent and meaning of the Contract Documents is that the Contractor, under the terms of the Contract, shall take all actions necessary and required to provide all labor, plant, materials,supplies, equipment, transportation, facilities, and appurtenances which are indicated or implied by each Drawing and each Section of the Specifications, all of which are collectively necessary and required for the construction of the described Project. 2. The Project includes removal and replacement of the generator diesel fuel Underground Storage Tank (UST) at Concourse B (UST #8) with a new 2,000-gal UST, the removal and replacement of the generator diesel fuel UST at Concourse A North (UST #9) with a new 2,000-gal UST, and the closure in place of the generator diesel fuel UST at Concourse A South (UST #10) and installation a new 500-gal AST. 3. The Contractor acknowledges that it has examined and thoroughly familiarized itself with all existing conditions including all applicable laws, codes, ordinances, rules, and regulations that will affect this work. The Contractor further acknowledges that it has visited the site, examined the grounds and all existing utilities and roads; that it has investigated and satisfied himself as to conditions affecting the work including, but not restricted to, those bearing upon transportation, disposal, handling and storage of materials, and the character of equipment and facilities needed preliminary to and during prosecution of the work.

Bid Results

Water / Sewer

$500,478.00

Public - County

Site Work

16

22

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
115
Bidding Soon
2,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

November 26, 2024

Project location map

3087 Terminal Dr, Hebron, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.