BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and paving for a mixed-use development in Canyon City, Oregon. Completed plans call for the demolition of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

J.O. 24-0__ Project Location: The project is located in Canyon City, Oregon at 329 N Humbolt St. The project starts in Humbolt Elementary School parking lot and the Greenhouse site is North East of the playground. The work generally consists of the following construction to create a building site: Schedule 'A' - Mobilization, Clearing and Grubbing, Fence and Misc. Demo, Approximately 475 CYs of Embankment, 295 ton of 3/4"-0" C.R., 20 ton of 3/8"-0" C.R., 1976 sf of sidewalk, 230 lf of handrail, a greenhouse foundation and other misc. concrete pads, 25 lf of 18"-30" rockery wall, 145 lf of 1" waterline and 310 lf of 2" conduit. All proposals shall be made on Proposal Forms, Bidder's Certification Statements, Insurance Requirement Form, Employee Drug Test Certification Form, and First Tier Subcontractor Form (within two hours of bid closing). Once awarded a one hundred percent (100%) performance bond and one hundred percent (100%) payment bond will be required to guarantee the faithful performance of the contract. Bidders need to be aware that Grant School Districts summer office hours are Mon-Thurs 7:00am-5:00pm and that overnight delivery service is not always available in this area. The Contract is for public work subject to ORS 279C.800 to 279C.870. The Grant School District 3 reserves the right to reject any or all bids if it is in the public interest to do so, may reject any bid not in compliance with all bidding procedures and requirements, to postpone the award for 30 days, to delete items from the proposal, and to award the contract to the lowest possible bidder per each schedule listed.

Award

Sidewalks / Parking Lot

$134,531.00

Public - County

Demolition, Paving, Site Work

10

11

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
9
All Active Projects
4
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

img_map_placeholder

329 N Humbolt St, Canyon City, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.