BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a clubhouse / community center in Bellevue, Washington. Completed plans call for the demolition of a clubhouse / community center; for the construction of a clubhouse / community center; and for site work for a clubhouse / community center.

As of July 15, 2024, project has not been awarded yet. Timeline for award is on August 6, 2024. SCOPE OF WORK: Work contemplated to be performed under this contract is as follows: Demo and removal of all existing Challenge Course elements including poles, installation of new poles, construction of new challenge course elements per design and complete restoration of all access and work areas. The City of Bellevue reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding process. No bidder may withdraw his bid for a period of sixty (60) calendar days after the date and time set for the opening thereof. BIDDER'S QUESTIONS: All bidders questions will be directed by email only to the Project Manager, Scott Vander Hyden at Svanderhyden@bellevue wa.gov received no later than 5PM on 6/20, no questions will be answered after this date and time. An addenda with all questions received along with answers will be posted online and sent out to all known prospective bidders on 6/24.This addenda must be acknowledged on the Bid Proposal Form in order to be included as a responsive bidder. BID BOND REQUIRED: Each bid shall be accompanied by a bid bond in the form of cash, certified check, cashier's check or surety bond in an amount equal to at least 5% of the amount of such bid. Checks shall be made payable to the City Treasurer. Should the successful bidder fail to enter into a contract and furnish a satisfactory performance and payment bond within the time stated in the specifications, the bid bond shall be forfeited to the City of Bellevue. STANDARD AND SUPPLEMENTAL BIDDER CRITERIA will apply to this project and are included in: City of See Bellevue Standard Provisions 2.03, 2.04 and 2.05. In a timely manner, Bidders may request, in writing, that the City modify the supplemental criteria. The City reserves the right to modify or not modify the supplemental criteria in its discretion. The City shall issue an Addendum, prior to the Bid Due Date, should it modify the supplemental criteria. The City shall not modify the supplemental criteria after the Bid Due Date, therefore, Bidders are encouraged to discuss with the project manager immediately and before the Bid Due Date the relevancy of the supplemental bidder criteria. Any bidder determined to be not responsible based on these bidder criteria may appeal the City's determination by providing additional information to the City within two 2 business days following receipt of the City's written determination that the bidder was determined not responsible. The City of Bellevue reserves the right to reject any and all bids and to waive irregularities and informalities in the bidding process. No bidder may withdraw their bid for a period of sixty (60) days after the date and time set for the opening thereof. The successful bidder must comply with the City of Bellevue equal opportunity requirements. The City of Bellevue is also committed to complying with Title VI of the Civil Rights Act of 1964, that provides "No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance." The City of Bellevue in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award.

Bid Results

Clubhouse / Community Centers

$998,642.00

Public - City

Demolition, New Construction, Site Work

19

11

2

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
32
Bidding Soon
881
All Active Projects
373
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

October 7, 2024

img_map_placeholder

14509 SE Newport Way, Bellevue, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.