BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2024 at 8:00 PM

Updated July 4, 2024

Site work and paving for a transportation facility in Bolivar, Tennessee. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

All bidders must comply with all provisions in law relative to work covered by this invitation. All bidders must be licensed contractors to perform the type construction herein described as required by Tennessee Code Annotated, Title 62, Chapter 6. The Bidder's Name, License Number, Classification and Expiration Date must be placed on the envelope containing the contractor's bid. Each proposal must be accompanied by a bidder's bond on the form obtained in the proposal from a surety company acceptable to the Hardeman County Airport or a Cashier's Check or Certified Check made payable to the Hardeman County Airport, for not less than five percent (5%) of the total amount of the bids based on the high alternate. A 100% Contract Bond will be required. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. Hardeman County, in accordance with Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d) and 49 CFR, Part 23, Non-Discrimination in Federally Assisted Programs of the Department of Transportation, hereby notifies all bidders that it will affirmatively ensure that disadvantaged business enterprises are afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The right to reject any or all bids and to waive technicalities is reserved. Any bid received after the scheduled closing time for receipt of bids will be returned to the bidder unopened. Bids will be required to remain open for acceptance or rejection for Ninety (90) calendar days after the date of opening bids. For further information, communicate with Mr. Jason Dittrich, P.E.; Project Manager via email jasond@a2h.com; or A2H, Inc.; 3009 Davies Plantation Road, Lakeland; Tennessee 38002, (901) 372-0404, bidding@a2h.com. Question Deadline 06/20/2024 No interpretation of the meaning of the specifications or other pre-bid documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to Jason Dittrich, P.E. (jasond@a2h.com), A2H, Inc., 3009 Davies Plantation Road, Lakeland, TN 38002, and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids

Post-Bid

Transportation Terminals

$500,000.00

Public - County

Paving, Site Work

22

14

5

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
62
Bidding Soon
719
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

Project location map

800 Airport Rd, Bolivar, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.