BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Guthrie, Oklahoma. Working plans call for the construction of a fire / police facility; for site work for a fire / police facility; and swimming pool.

The owner has selected a Construction Manager. A timeline for construction has not yet been established. https://guthrienewspage.com/updates-to-capital-improvement-projects-with-key-developments/ Updates to Capital Improvement Projects with key developments JULY 3, 2024 In a significant step forward for Guthrie’s infrastructure, city officials have made notable progress on several Capital Improvement Projects (CIP). On Tuesday, city officials interviewed construction management firms for both the second fire and EMS station and the municipal pool project. City Manager Eddie Faulkner expressed optimism about the process and anticipated having results soon to move forward with these essential projects. “We’re looking forward to the results and should have something soon to be ready to move forward on those projects,” Faulkner said. Water Towers and ADA Compliance The city has also signed a task order with Myers Engineering to address the water towers. Both facilities have been tested for lead paint to ensure compliance with regulations. The next steps involve sandblasting, removing the paint, and ensuring all regulatory standards are met. Additionally, efforts to upgrade intersections to meet Americans with Disabilities Act (ADA) standards are underway, also in collaboration with Myers Engineering. Faulkner mentioned that CIP number two projects are progressing well, with visible work expected by October of this year. Sidewalk Project Enhancements The sidewalk project along Division Street is making excellent progress. The crew’s performance has been commendable, and the city is pleased with the work. An important aspect of the project is the preservation and addition of brick on the sidewalks. The community can expect more bricks than what previously existed, ensuring that all original bricks will either remain or be put back. “This is a big point for the community to be reminded that no brick will be lost on this project,” Faulkner assured. These developments signal Guthrie’s commitment to enhancing its infrastructure and ensuring compliance with modern standards, promising significant benefits for the community. ______________________________________________ The project delivery method will be At-Risk Construction Manager with a Guaranteed Maximum Price. The successful firm will work with the City and architect to provide preconstruction and construction services to achieve a cost-effective design and a high-quality project. The successful firm will be responsible for scheduling, estimating, value analysis, constructability reviews, bidding, project administration and continuous inspection for quality / cost control and safety. The parties' obligations, including scope of services, will be governed by the Standard Form of Agreement between Owner Construction Manager (AIA A133-2019), as amended by the City. The response to this RFQ shall include a fully completed Construction Manager Qualification Statement and a statement of the proposed amount for Construction Management Fee (expressed as a lump sum or percentage of the Cost of the Work) and General Conditions. The General Conditions shall include all management staff, project staff, superintendent and, where necessary and appropriate, construction office with set up. Reimbursable expenses permitted in addition to General Conditions will be determined after the project has been designed and may include, where applicable, testing services, equipment rental, job signs, fencing and construction barriers, postage, cleaning and permitting costs. The City will review the responses to the RFQ and select two or more candidates for interviews. The City will select a candidate who, on the basis of professional qualifications, technical experience and past performance, best satisfies the needs of the project and represents the best value to the City. Owner Rights: The City reserves the right to accept or reject any candidate or to take any course of action that may be determined to be most advantageous to the City. For more information, contact Jessie Bryan, Deputy City Clerk for the City of Guthrie at (405) 282-0053 or jbryan@cityofguthrie.com The City of Guthrie is an equal opportunity employer.

Pre-Construction/Negotiated

Fire / Police

$100,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
45
Bidding Soon
432
All Active Projects
192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Guthrie, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.