BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Saint Augusta, Minnesota. Conceptual plans call for site work for a water / sewer project.

The City of St. Cloud, Minnesota is soliciting proposals from interested consultants for professional services related to design phase services for the Nutrient, Energy & Water Recovery Facility (NEW RF), Digester Upgrades and Renewable Energy Improvements. The desired services include, but are not limited to, conducting technology reviews and workshops; tech memo development; preparation of plans and specifications; preparation of bidding documents; and provisions for possible professional services related to construction phase management. Proposed Improvements include; o Full conversion of secondary digester(s) to primary digester, o Rehabilitation or replacement of digester covers, o Replacement of digester mixers and draft tubes where necessary, o Installation of a 3rd dedicated heat exchanger, including piping, valves (including mixing valve), hot water circulating pump and instrumentation, o Replacement of existing draft tube mixers, matching same spec of 2022 mixer, *Reinstallation of Digester 1 mixer previously replaced, to new cover, o Instrumentation upgrades. The proposal submitted by the Consultant shall include a technical description of the planned approach to accomplishing the Work Plan; including tasks to be performed, methods to be employed, areas of special emphasis, an estimate of the time required to complete the various elements, and the number and qualifications of the people that will be needed to accomplish the Work Plan. The Consultant must demonstrate an understanding of the project requirements, the capability to provide the requested services, and a commitment to meet the proposed schedule. This phase includes preparation of detailed plans, specifications and bid documents. In the proposal explain, Final Design Services must be completed with plans and specifications delivered to the MPCA by the CWRF deadline, which is 6 months after the PFA approves the 2025 CWRF IUP. There may be some earlier construction milestones that will be completed in order to comply with Inflation Reduction Act related requirements. This may need to occur as early as before December 31, 2024. Tentative Selection Announced July 15, 2024 Request For Proposals Advertised June 7, 2024 Submit any questions, in writing, to the Jacob Ethen, Wastewater Services Manager by June 21, 2024. A written response will be provided to all interested firms. Site visits can be requested via phone or email to Mr. Ethen. Mr. Jacob Ethen, Wastewater Services Manager jacob.ethen @ci.stcloud.mn.us 320-255-7226 The Consultant's fee for completing Design Phase Services is an important consideration, however, qualifications, experience, approach to completing the work, and ability to address the City's needs are the most important criteria. The cost proposal w i l l b e u s e d w i t h a l l o t h e r e l e m e n t s o f t h e s u b m i t t a l f o r m a k i n g a recommendation. The cost proposal will not be considered a bid; it will be the starting point for negotiating a contract for this work. The City reserves the right to negotiate professional services from the selected consultant as deemed necessary to ful fill the complete project intent. The City reserves the right to terminate the contract and delete all remaining work tasks at its discretion. The method of Contractor Selection has not been Determined at this time

Conceptual

Water / Sewer

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
62
Bidding Soon
1,416
All Active Projects
478
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 26, 2024

December 31, 2024

img_map_placeholder

Multiple Locations, Saint Augusta, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.