BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Portugal Cove-St Philips, Newfoundland. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Closing Time: 2:00 PM (NT) The scope of repairs includes removal and disposal of old asphalt, removal of unsuitable subgrade material, preparation of subgrade, addition of class "A" compacted granular material (as required), and placement of 2 lifts of asphalt to a total thickness of 80mm. The perimeter of the repair area, if not already, shall be saw cut to be a square edge (with tack coat) to allow full thickness asphalt for the entire area of the patch (no taper). Areas to be repaired are identified in Appendix C and limits of removal will be marked out in the field by Town staff. The contractor shall complete a "check sheet" (Appendix D) for each repair area. The contractor is responsible for verifying that all work performed is in accordance with the relevant specification section from the Department of Municipal Affairs Municipal Water, Sewer, and Road Specifications. The total area for removal and replacement sites is 4006.25 square meters (no contingency) as outlined in Appendix C - Repair Areas. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Roads / Highways

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
9
Bidding Soon
118
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

img_map_placeholder

Multiple Locations, Portugal Cove-St Philips, NL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.