BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2024 at 8:00 PM

Updated July 24, 2024

Demolition and site work for a medical facility in Anchorage, Alaska. Completed plans call for the demolition of a medical facility; and for site work for a medical facility.

Project Consists of: Complete Demolition, Nothing to Remain. Utility Demolition General Notes: 1. Sewer Line: Awwu Has Requested That the Sewer Line Be Cut and Capped Below Grade Where It Enters the Building. The Riser is to Be Cut and Capped Below Grade and Then Backfill and Cover With Gravel So That It Cannot Be Tampered With. 2. Water Line: Awwu Will Require the Water Service Be Disconnected at the Key Box. Awwu is Also Requesting to Be Notified So They Can Be on Site to Verify Placement. 3. Gas: Enstar Has No Record of a Meter on the Site for Over 10 Years. Contractor to as Built All Locations of Utilities When They Are Left Abandoned Under Grade. Contractor to Notify Moa Regarding Locations of Any Below Grade Utilities Encountered During Building Demolition. Estimated Construction Cost: Between: $50,000 - $500,000 Question Deadline 06/13/2024 at 12:00 PM AKT Requests for interpretation or clarification of the bidding Documents shall be made in writing to the Purchasing Office at online The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding forty-five (45) days from the time of the opening. SCOPE OF WORK Article 4.1 Intent of the Contract Documents The intent of the Contract Documents is to provide for the execution and completion of the Work in its entirety. Except as otherwise specifically provided herein, the Contractor shall provide all permits, transportation, handling, materials storage, labor, tools, implements, machinery, supplies, water, heat, utilities, cleaning supplies and activities, and incidentals and shall do all things necessary to perform and to complete the Work.

Award

Medical

$134,037.00

Public - City

Demolition, Site Work

4

10

2

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

Project location map

1825 Academy Dr, Anchorage, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.