Site work and paving for a mixed-use development in Fort Collins, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.
THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO NOTIFY THE PUBLIC OF A NECESSARY AND JUSTIFIED CONSOLIDATION OF CONTRACT REQUIREMENTS FOR THIS PROJECT. The Agency has determined that consolidation is justified and necessary in accordance with FAR 7.107-2 (a). The Senor Procurement Executive of FHWA signed off on the use of consolidation for this project on September 20, 2024. The benefits of the consolidated acquisition substantially exceed the benefits that would be derived from alternative contracting approaches. Please see the attached approved determination. This project will be advertised a TOTAL SMALL BUSINESS SET ASIDE. PROJECT NUMBER: CO FLAP LAR 10(1) PROJECT NAME: Horsetooth Res and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually. SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction. PRINCIPAL WORK ITEMS: 26,000 cubic yards of roadway excavation 23,000 cubic yards of waste 120 cubic yards of rip rap 26,000 tons of aggregate base 23,000 square yards of full depth reclamation 20,000 tons asphalt concrete pavement 1300 square yards minor concrete pavement 1,100 linear feet of pipe culverts (24" to 42") with end sections 7 each manholes 4,000 linear feet curb concrete 600 square yards sidewalk concrete 23,000 square yards placing topsoil and seeding (hydraulic method) 75 each sign system 28 miles pavement markings 1 lump sum temporary traffic control ANTICIPATED SCHEDULE: Advertisement - October 2024 Award- November 2024 Construction- April 2025 through November 2026 The estimated price range of the project work is between: $10 million and $20 million The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Roads / Highways
$20,000,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2024
April 1, 2025
Multiple Locations, Fort Collins, CO
Related To This Project
Fort Collins, CO
Bid Date: Oct 24 2024
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Oct 15 2024
Fort Collins, CO
Bid Date: Oct 21 2024
Fort Collins, CO
Bid Date: Oct 18 2024
Fort Collins, CO
Bid Date: Oct 10 2024
Fort Collins, CO
Bid Date: Oct 23 2024
Fort Collins, CO
Bid Date: Oct 29 2024
Fort Collins, CO
Bid Date: Sep 15 2020
Fort Collins, CO
Bid Date: Sep 27 2024
Fort Collins, CO
Bid Date: Oct 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.