BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a military facility in Columbus, Mississippi. Conceptual plans call for the addition of a military facility; for the demolition of a military facility; for the renovation of a military facility; and for site work for a military facility.

The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the addition and alteration to B406 Paint Barn. Perform all work according to this Statement of Work (SOW), the 100% Design, 100% Specifications, and all related AF requirements and other codes and references. Contruction must be accomplished in accordance with applicable UFC's, ETL's, (UFC's and ETL's may be found on-line at www.wbdg.org) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices (Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW. The IFS document may be found at the following location: http://www.wbdg.org/ffc/af-afcec/installation-facilities-standardsifs/columbus-afb-ifs. The government will furnish 100% design documents to the contractor, including drawings (PDF and CAD) and specifications. The contractor is expected to keep accurate redline drawings during construction and submit As-Builts upon project completion. Deliver two (2) hard copies of As-Builts (24"x36") and one (1) digital copy via DoD SAFE containing each drawing sheet in both PDF and CAD file format directly to the CO, along with AF Form 3000. For uploading to DoD SAFE, the Contractor must request an upload link from the CO and then upload the files using the details in the subsequent email from DoD SAFE. For the As-Built submittal, the contractor is to provide, in addition to the hard copies and digital copies via DoD SAFE, (1) CD-ROM containing the PDF file as well as the associated CAD files in AutoCAD (Release 2020) .dwg file format. Hard copy submittals and CD-ROMs must be delivered to: 14th Contracting Squadron 495 Harpe Blvd, Suite 293 Columbus, MS 39710 The contractor is responsible for verification of existing dimensions, conditions, etc., and constructability based on provided design, and bids should reflect all costs necessary to complete construction. If the contractor encounters any unforeseen site conditions at any time, prior to or after contract award, the contractor must notify the CO immediately before proceeding with any work. BACKGROUND The facility is currently not configured to adequately allow for proper decontamination of personnel engaged in painting operations. Additionally, the facility is currently experiencing air flow issues in the paint process supply/exhaust system. The goal of this project is to configure the PPE locker/decontamination area to meet current requirements and to provide a solution for the issues with the supply/exhaust system in the paint bays. SCOPE OF PROJECT The Project involves a renovation and addition to B406 Paint hangar Administration and Decontamination area. A new fire alarm and mass notification system will be installed through the administration and decontamination area, while existing fire alarm system components will remain as-is in the paint bays. The project involves control work on the mechanical system in the paint bays. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$5,000,000.00

Public - Federal

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
54
Bidding Soon
619
All Active Projects
326
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 24, 2025

img_map_placeholder

To Be Determined, Columbus, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.