Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2024 at 8:00 PM

Updated June 21, 2024

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000271883 Question Acceptance Deadline 2024/06/14 03:00:00 PM CDT Pricing Lump sum The Site Location for the Project is Richardson College for the Environment and Science Complex (Rcfe) Located at 599 Portage Avenue. The Redevelopment Area is on the Exterior of the Building at Ground Level. It is on University Property, Adjacent to the Building Along the North Side of Portage Avenue and West Side of Langside Street. The Scope Includes: 1. Supply and Installation of Soil I.e., Planting Medium and Fine Grading: The Successful Bidder Will Be Subject to the Stipulated Quality Assurance, Waste Management and Disposal as Well as Delivery Storage and Handling. The Details of the Products: Topsoil, Peatmoss, Compost, Sand, Fertility, and Planting Medium Have Been Provided in the Attached Documents. The Excavation Details With Regards to the Preparation of Existing Grade, Placing, and Spreading of Planting Medium as Well as Finish Grading. There is No Topsoil Available and Therefore Needs to Be Imported. 2. Supply and Installation of Vegetation I.e., Trees, Shrubs, and Groundcovers, Including Planting Accessories: The Successful Bidder Will Be Subject to the Stipulated Source Quality Control, Submittal Requirements, Shipment and Pre-planting Care, Warranty of Nursery Stock, and Replacements. The Details of the Products: Plant Material and Other Material as Mentioned in Attached Documents. The Execution Details Include Planning Time and Workmanship, Excavation, Planting, Tree Support, Pruning, and Mulching. The Plant Schedule Identifying the Flora and Fauna Has Been Provided in the Attached Drawings. 3. Removal of Existing Concrete Slab and Providing Waterproofing Insulation as Required and Identified. 4. Protection of All Surrounding Infrastructure Onsite as Identified and Appropriate From Project Work. The Successful Bidder's Responsibilities Include: 1. Cost of Testing the Planting Medium. 2. Street/lane Closures as Required. The Owner is Responsible for Any Plan Approval From the City as Required. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
76
Bidding Soon
595
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

Project location map

599 Portage Ave, Winnipeg, MB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed