BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Wiggins, Mississippi. Completed plans call for site work for a road / highway; and water / sewer project.

As of July 23, 2024, project is not yet awarded, the apparent low bidder is Apple Construction, amount not available. The project consist of connections to existing sanitary sewer main, removal of existing sanitary sewer manholes and piping, installation of new manholes and sanitary sewer main, removal of storm drain pipe, installation of new storm drain pipe, site grading for ditch, and installation of rip rap lined ditch. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount. Bids in excess of $50,000.00 must be marked on the outside of the envelope with the contractor's Mississippi certificate of responsibility number as issued by the Mississippi Board of Contractors. No bidder may withdraw his bid within ninety (90) days after the actual date of the opening thereof. The Owner reserves the right to accept or reject any or all offers PROJECT DESCRIPTION A. Summary Project Description: This project will consist of the following general scope of work. This description is provided for convenience purposes only and shall not be considered all inclusive. It is the general contractor's responsibility to become fully famliar with the existing conditions, review all of the construction document drawings, specifications, and any additional information documents in their entirety and bring forth any and all questions regarding scope confusion, misinterpretations, and/or possible errors and omissions to the Architect and/or Engineer prior to bid submission and/or start of construction. 1. The project consist of connections to existing sanitary sewer main, removal of existing sanitary sewer manholes and piping, installation of new manholes and sanitary sewer main, removal of storm drain pipe, installation of new storm drain pipe, site grading for ditch, and installation of rip rap lined ditch.

Bid Results

Water / Sewer

$200,000.00

Public - City

Site Work

13

17

6

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
43
Bidding Soon
500
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

August 12, 2024

img_map_placeholder

S Vardaman St & W Cavers Ave, Wiggins, MS

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.