BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Paradise Valley, Arizona. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The owner has determined a prequalified list of construction managers. https://theconstructionbroadsheet.com/sundtjacobs-team-selected-for-m-arizona-i-project-p1845-175.htm Sundt-Jacobs team selected for $600M Arizona I-10 project The Arizona State Transportation Board has approved a contract with Sundt-Jacobs for the largest construction project in southern Arizona history – the $600 million reconstruction and widening of Interstate 10 (I-10) near downtown Tucson, according to the Arizona Department of Transportation (ADOT). The design-build project, which the ADOT expects will begin in 2025 and wrap up in 2028, will include: Widening I-10 to three lanes in each direction between Kino Parkway and Alvernon Way and to four lanes in each direction west of Kino Parkway; Reconstruction of the interchange at Kino Parkway; Removal of the existing interchange at Palo Verde Road; Construction of a new interchange at Country Club Road, which will provide safer access to and from I-10 for the traffic that now uses the Palo Verde Road interchange; Construction of a new westbound on-ramp at the Alvernon Way interchange; and Construction of an I-10 undercrossing to connect the North and South Kino Sports Complex. The project is the first to result from a 2020 study that developed ways to best improve mobility along approximately 10 miles of I-10 and that identified an alignment for an extension of State Route 210 that will connect I-10 to downtown Tucson, the ADOT said. The department said it will share more details on improvements to the two corridors early next year. At its most recent meeting, the State Transportation Board also approved other infrastructure contracts, which include (rounded dollar amounts): $4.7 million to Combs Construction Company Inc. (Combs) for the removal of existing roadways and intersection, the installation of a one-lane roundabout with lighting, sidewalks and related work along Highway 89 in the town of Page in Coconino County; $2.6 million to Asphalt Paving & Supply Inc. for raised median construction, pavement markings application, signing and lighting installation and other related work in Bullhead City, Mohave County; $2.4 million to The Ashton Company Inc. for guardrail and guardrail end terminal replacement, drainage improvement, rock fall mitigation and related work within the boundaries of the Tohono O’odham Nation in Pima County; $2.3 million to Combs for drainage improvements at five locations, replacement of existing pavement, removal of existing guardrail and fence, riprap placement, pavement marking and related work near Gila Bend in Maricopa County; and $2.1 million to Sunland Asphalt & Construction LLC for removal and replacement of existing asphalt, pavement markings, sidewalk ramps, pedestrian access improvements and related work in Navajo County. _____________________________________________________ Ref. #: 25-001-ENG CMAR The Town of Paradise Valley (the "Town") is issuing this Request For Qualifications (this "RFQ") seeking statements of qualifications ("SOQ") from qualified, licensed firms ("Vendors") interested in providing Construction Manager at Risk (CMAR) services to provide preconstruction and complete construction phase services for horizonal construction related to street improvements for Mockingbird Lane, from 56th Street to Invergordon. Questions Due Date: May 30th 2024, 9:00 AM MST Questions through Online Portal

Final Planning

Roads / Highways

$12,000,000.00

Public - City

Paving, Site Work

30

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
13
Bidding Soon
702
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

November 18, 2024

img_map_placeholder

N Mockingbird Ln, Paradise Valley, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.