Published August 19, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Saginaw, Michigan. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

The work includes the removal of concrete and hot mix asphalt (HMA) pavements, concrete sidewalks, floor slabs, foundations, and in-ground hoists prior to excavation of soil contaminated with petroleum products. The contaminated soil will be transported and disposed in a Type II disposal facility. Following excavation, off site environmentally clean granular soil will be used to backfill the excavation. Site restoration will include placement of new concrete sidewalks along the west and south boundaries of the project area, grading the site to match existing grades, and surfacing the site with topsoil that will be seeded and mulched. 5% Bid Security Please do not submit online questions . ALL questions should be emailed to Brian Berger at brian.berger@sme-usa.com no later than 2:00 p.m., Eastern on June 21, 2024. Installation and removal of approximately 450 lineal feet of 6 feet tall temporary steel chain link fencing Coordinate traffic control including a lane closure on Lapeer Avenue and North 6th Avenue, and sidewalk closure adjacent to site. Remove and dispose of concrete slab, foundations, and in-ground hoists associated with the former building. Clean, remove, transport, and dispose of potential underground storage tanks (USTs) below the former building. Sawcut, removal, and disposal of approximately 400 tons of hot mix asphalt (HMA), concrete pavement and concrete sidewalk at a licensed Type II disposal facility or recycling facility. Cut, plug/cap, and abandon onsite utilities encountered during removal of concrete slab and foundation of the former building and/or during excavation. Excavation, removal, and disposal of approximately 5,000 tons of contaminated soil at a licensed Type II disposal facility. Management and disposal of approximately 70,000 gallons of non-hazardous impacted groundwater at a licensed disposal facility. Placement and compaction of approximately 5,100 tons of MDOT Class II sand. Placement of approximately 25 cubic yards of Portland Cement concrete pavement sidewalk along the west and south sides of the project area. Placement and seeding of approximately 9,500 square feet of topsoil (6 inches thick). PN - 093632.00

Award

Water / Sewer

$435,600.00

Public - State/Provincial

Paving, Site Work

47

12

5

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
79
Bidding Soon
888
All Active Projects
454
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2024

August 2, 2024

img_map_placeholder

102 N 6th Ave, Saginaw, MI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.