BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lincoln, New Hampshire. Completed plans call for site work for a water / sewer project.

. Project includes installation of approximately 6,200 linear feet of 12-inch high density polyethylene (HDPE) and ductile iron water main within New Hampshire Department of Transportation (NHDOT) right of way on Route 3, as well as valves, hydrants. transfer of existing water services, horizontal directional drill installed water services, pavement and surface restoration, and abandonment of the existing water main along Route 3. Completion time for the project will be calculated as calendar days from the date specified in the "Notice to Proceed as follows: 150 calendar days for substantial completion. 180 calendar days for final completion. Liquidated damages will be in the amount of $ 1.200.00 for each calendar day of delay from the date established for substantial completion, and $ 1,200.00 for each calendar day of delay from the date established for final completion. Each General Bid shall be accompanied by a Bid Security in the amount of 5% of the Total Bid Price. The successful Bidder must furnish 100% Performance and Payment Bonds, and will be required to execute the Contract Agreement within 10 days following notification of the acceptance of his Bid. No Bidder may withdraw a Bid within 60 days after the actual date of opening thereof The Owner reserves the right to waive any informality or to reject any or all bids when such action is deemed in the best interests of the Owner. Non-responsive and/or unbalanced bids may be rejected

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

10

14

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
55
Bidding Soon
979
All Active Projects
286
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 27, 2024

July 29, 2024

January 25, 2025

img_map_placeholder

148 Main St, Lincoln, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.