Renovation of an educational facility in Saint Louis, Missouri. Completed plans call for the renovation of a educational facility.

Renovation of Room 017 Prevailing wages apply. The University reserves the right to reject any and all proposals and to waive all informalities in proposals. SDVE 3%. Scope of Work for General Contractor for the HSSU Henry Givens Jr. Administration Building Room 017 Renovation The Owner's Representative (OR) referred to below is NAVIGATE Building Solutions, LLC. The Owner referred to below is the Harris Stowe State University. The Contractor referred to below is the General Works Contractor. This bid package includes, but is not limited to, the following: All work outlined by the project documents issued by NAVIGATE Building Solutions, LLC. 1. Contractor is aware of the potential for Liquidated Damages. Contractor shall be responsible to maintain scheduled items for the Contractor's work as included in the Master Project Schedule below. Contractor shall reference AIA 101 and AIA 201 contract drafts provided in the bid documents. Contractor agrees to pay the Owner, or to deduct from the Contract Sum, not as a penalty, but as liquidated damages, the amounts listed in the contract drafts provided. 2. The draft AIA 101 and AIA 201 have been modified from their original versions. Contractor shall read and agree to these documents as part of the bid process. 3. Upon execution of this contract, this contractor must submit to the OR a detailed critical path baseline construction schedule outlining each construction activity and phase. This schedule must fall within the Master Project Schedule outlined below and be submitted no later than ten (10) days following execution of the contract. Contractor is required to provide updated work schedules at a minimum on a monthly basis with each pay application. Contractor's detailed activity schedule/critical path schedule shall adhere to the Master Project Schedule and shall provide for expeditious and practicable execution of the Work. Should the Contractor fall behind schedule by more than 5 workdays due to the fault of this Contractor, the Contractor shall provide a recovery schedule to the OR within 5 days of Question Deadline 06/25/2024 at 4:00 PM CT

Post-Bid

Educational

$130,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
36
Bidding Soon
808
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

July 26, 2024

img_map_placeholder

3026 Laclede Ave, Saint Louis, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.