BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2024 at 8:00 PM

Updated June 25, 2024

Site work and paving for a road / highway in Savanna, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Savanna MFT 2024. Est. Completion Date: Aug. 23, 2024 Site Directions: Walnut Street, Glenmoor, Alley Behind Sipi Side. Description: This project consists of roadway improvements to Walnut Street, Glenmoor Street, and 110 Feet of the alley behind Sipi Side. The roadways will be overlayed with 2 lifts of asphalt. All work shall be done in accordance with attached IDOT provisions and Memorandums .

Bid Results

Roads / Highways

$49,680.00

Public - City

Paving, Site Work

9

3

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
109
Bidding Soon
1,296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2024

July 22, 2024

Project location map

Multiple Locations, Savanna, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.