BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2024 at 8:00 PM

Updated July 10, 2024

Site work for a water / sewer project in College Station, Texas. Conceptual plans call for site work for a water / sewer project.

It is the City's intent that the successful Firm will be involved for the full duration of the design development, preparation of construction and bidding documents, and construction administration phases of the project. The successful Firm, its subsidiaries, parent entities, partners, other entities that share common ownership or control, and/or any subconsultant firms utilized for this project, are prohibited from bidding on the construction phase of this project. A general description of the scope of work for this project is provided below. The goal of this project is to design the relocation of an existing 16" waterline crossing Wellborn Road at Grove Street that has been identified as a waterline conflict with TxDOT improvements in Wellborn Road. Additional SUE may be necessary to confirm no additional conflicts previously unidentified. The relocation includes approximately 275 linear feet of a 16" diameter water distribution line, and all excavation, pipe, bedding, backfill, site restorations and appurtenances with and without steel casing using open cut and trenchless methods. Coordination with the Texas Department of Transportation and Union Pacific Railroad will be required. The consultant shall provide design and construction phase services which may include preparing plans specification and estimates, as well as bid and contract documents, construction materials testing, permit applications, and attending meetings. Geotechnical Engineering Services (SUE) Civil Engineering services Survey Topographic services Provide construction cost estimates at each design phase Provide design schedule and estimated construction time The method of Contractor Selection has not been Determined at this time. Questions Deadline: 6/26/2024 02:00 PM (CT)

Conceptual

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
195
Bidding Soon
3,446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

Project location map

Multiple Locations, College Station, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.