BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pawleys Island, South Carolina. Completed plans call for site work for a water / sewer project.

Furnish all necessary materials, tools, equipment and labor for Pump Station 240 Rehabilitation located at 41 Harrow Ln, Pawleys Island, South Carolina 29585. All work shall be in accordance specifications listed in the Bid Package, and the recommended practices of the American Water Works Association (AWWA) and the South Carolina Department of Health and Environmental Control (SC DHEC). Every request for such information should be in writing to GCWSD, PO Box 2730, Pawleys Island, SC 29585, or by email to michaely@gcwsd.com. To be given consideration, such request must be received at least seven (7) days prior to the date fixed for the opening of 7 Bids. Contractor shall remove existing discharge piping and placement of new, above ground discharging piping and valves. Drawing is attached on similar configuration of new pipe arrangement. (Illustration only) Contractor shall provide all Materials, Pipes, Valves and parts necessary for the project. For the pump basin, Contractor shall: o Grout Fill Existing Discharge Holes. o Core Wet Well Top o Supply & Install New Offset Flange Fittings. o Supply & Install New Stainless Steel (SS) Vertical Flanged Piping. The owner will provide pump station bypass for the duration of the project. The owner will provide pumps, pump base L's, and guide rails for the pump basin. The owner will provide electrical connections for the pumps to the control panel. The owner will clean the pump basin before the start of the project. Contractor shall perform All excavation to existing force main. Contractor shall Tie into existing force main and abandon in place of existing valve pit or arrangement. Contractor shall furnish and install (2) Check Valves, (2) Plug Valves and (1) Bypass hookup complete with plug valve. Lugged body valves shall mount to the pipeline flanges with bolts only. Contractor must ensure that the valve, the pipeline and the mating connections are aligned and centered Contractor shall supply Complete Drawing of New Piping Layout

Post-Bid

Water / Sewer

$1,280,000.00

Public - County

Site Work

3

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
46
Bidding Soon
509
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

September 2, 2024

img_map_placeholder

41 Harrow Ln, Pawleys Island, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.