BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of an educational facility in Montgomery, Alabama. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

ONLY CONTRACTORS who have completed the prequalification process within the stated time limits, and which are properly licensed for this type of work in accordance with criteria established by the state Licensing Board for General Contractors under the Provisions of Title 34, Chapter 8, Code of Alabama, 1975, as amended, will be considered for prequalification for the Work of this project. SCOPE OF WORK includes but is not limited to Architectural, Storefront, and Structural. Demolition of the existing windows. Replacing the windows with a new Aluminum Storefront. Providing new prefinished metal soffits and lintel liners. Demolition of existing CMU walls around old mechanical rooms in building D as shown. Demolition of the recessed floor in B and new structural floor infill as shown. Removal of exterior studs and replacement with new cold form studs as noted on drawings. Fireproofing between floors in buildings B, C, and D. The Contractor of this work shall work in conjunction with the Phase one demolition project noted above and with the other future (phase 3) contractor(s) that will be building out Buildings A, B, C, and D. It should be expected that these multiple projects will overlap in schedule requiring coordination of all the separate contractors working on the Executive Park site. A cashier's check or bid bond payable to Alabama Community College System in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000.00, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted.

Post-Bid

Educational

$1,500,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

44

23

29

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
16
Bidding Soon
354
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 29, 2024

img_map_placeholder

4520 Executive Park Dr, Montgomery, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.