BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Beale AFB, California. Conceptual plans call for site work for a water / sewer project.

Repair Trickeling Filter on a 1942 built Wastewater Treatment Plant. B. Project Scope. The Contractor shall furnish all design, labor, supervision, transportation, materials, testing, analysis, reports, permits, specifically air quality authority to construct permit, hauling, tools, equipment, and professional design services to accomplish all the work involved as necessary to: a. CLIN 0001 - Base Bid: Construction: Repair Trickling Filter 2 i. Trickling Filter Demolition 1. (4) Trickling Filter Spreader Arms and Tie Rods. 2. (1) Trickling Filter Center Assembly. 3. (1) High Pressure Water Blast, of the entire Trickling Filter 2 wall surface. ii. Remove Trickling Filter Pumps 1. (3) Pumps in the Recirculation Pump Station iii. Valve Vault 1. Replace (1) 6", CI/DI FLG Plug Valve, 150 Pound, w/ Epoxy 2. Replace (2) 0/0", 150 pound, A307 Steel Bolt Sets 3. Replace (2) 0/0", Full Faced Reb Rubber (SBR) Gasket 1/8" 4. Paint (1) 6" Valve, Brush Finish, (1 Primer/2 Finish) iv. Concrete, equipment pad 1. Replace (1) 52 SF equipment pad. v. Concrete Resurfacing 1. Approximately 850 SF, Layout Concrete Resurfacing Area 2. Approximately 850 SF, Surface blasting and cleaning, 3. Approximately 850 SF, Non-Shrink, Non-Metallic, 1" thick seal vi. Structural Concrete Rehabilitation 1. Approximately 200 LF of Concrete Crack Repair, with Epoxy Crack Injector, 1/4 " x 12" Deep. vii. Recirculation Pumps 1. Replace (3) Vertical Turbine Pump, 30 HP 2. Install Local Control Panel 3. Set VFD Control 4. Grout Equipment Base, Non-Shrink, Non-Metallic 5. Test and Check Vertical Turbine Pumps 6. Install (3) Strainers viii. Trickling Filter 1. Install (1) Trickling Filter Material 2. Install (1) Media Support System 3. Install (1) Plywood Protection at Media Installation 4. Install (1) BioGrid, Grating, for Supply Media. 5. Grout Equipment Base, Non-Shrink, Non-Metallic 6. Test and Check Trickling Filter ix. I&C Instruments 1. Replace 24" Magnetic Flow Meter FE/FIT 2. I&C Programming and Testing 3. Replace (1) Bolted Sleeve (Flex) Coupling for DIP (Dresser 38) 24"x7" Long 4. Replace (2) 24-0/0", 150 pound, A307 Steel Bolt Sets 5. Replace (2) Full Faced Red Rubber (SBR) Gasket 1/8" 6. Paint 24" Pipe, Spray, 1 Primer/2 Finish x. Small Valves 1. Replace (3) Small Diameter Valves, Check Valves, Swing, Flange, 3" xi. Plug Valves 1. Replace (3) 12", CI/DI FLG Plug Valve, 150#, w/ Epoxy 2. Replace (6) 12-0/0", 150#, A307 Steel Bolt Sets 3. Replace (6) 12-0/0", Full Faced Red Rubber (SBR) Gasket 1/8" 4. Paint 12" Valve, Brush, 1 Primer/2 Finish xii. Check Valves 1. Replace (3) Check Valve, Swing, Flg, 4" xiii. Special Purpose Valves and Accessories 1. Replace (1) 24" Valve Actuator xiv. Ductile Iron Pipe 1. Replace (6) 12-0/0" FLG Coupling Adaptor, 150# Dresser 128, DIP 2. Replace (12) 12-0/0", 150#, 316 SS Bolt Sets 3. Replace (12) 12-0/0", Full Faced Rubber (SBR) Gasket 1/8" 4. Replace (6) DI Pipe, FLxFL, CL53, CML, 12" x 1'-6" 5. Replace (6) DI Pipe, FLxFL, CL53, CML, 12" x 2-0" xv. Bollards 1. Install/Construct (2) Concrete Pipe Bollards, 2. Install/Construct (2) 18"x18"x18" concrete bases for bollards xvi. Slide Gates 1. Replace (3) 24"x24" Slide Gates 2. Replace the motor operator for 24" Slide Gates xvii. As-built Drawings 1. Provide As-built Drawings at the end of construction b. CLIN 0002 - Option 1: Construction: Replace 5-Way Valve i. Replace (1) 5-Way Valve between Trickling Filters and Clarifiers c. CLIN 0003 - Option 2: Construction: Repair Secondary Clarifier Weir i. Remove Existing FRP Effluent Weir ii. Install New FRP Weir, Baffles, Troughs and Launder Cover d. CLIN 0004 - Option 3: Construction: Repair Grit Removal System i. Demolish Existing Grit Removal System ii. Construct New Grit Removal System e. Government shall provide the Repair Wastewater Treatment Plant (B124), 100% Submittal - Issued for Construction drawings f. All installation(s) shall be completed in accordance with manufacturer's instructions. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Water / Sewer

$250,000.00

Public - Federal

Site Work

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
41
Bidding Soon
749
All Active Projects
296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

img_map_placeholder

To Be Determined, Beale AFB, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.